Operations Deployment Console

Switch Identity: Antonio | Moiz
Coordinator: Active As (Antonio)

Assign Resources

Project Personnel (Engineers & Support)
AMC Personnel (Engineers & Support)

Live Operational View (Target Date: 09-Sep-2026)

👤 Abdullah Sethwala (Presales Engineer)
Site 1: Dar Al Rokham LLC - https://maps.app.goo.gl/X1LtDvvyLnvxtXuj8
⏱️ 09:00 AM - 06:00 PM
Project 📦 No Material BCQ: LCSQ/2026/000949
Granstream Phone Installation and configuration.
👤 Akhil Dev (Support Engineer)
Site 1: Berkshire Hathaway Specialty Insurance Company - Level 21, Offices 2103, 2104 & 2105, Index Tower, DIFC, PO Box 506861, Dubai, UAE
⏱️ 02:00 PM - 06:00 PM
AMC 📦 No Material
Audit for the laptops.
Site 2: CLYMET LOGISTICS LLC - M 21, Al Qusais, Al Qusais Dubai United Arab Emirates
⏱️ 09:00 PM - 12:00 PM
AMC 📦 No Material
Check and rectify the Wifi Issues.
👤 Ali Asgar (Helper)
Site 1: ASAS AL AFIA MEDICAL - DAHID
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/004106
DEVICE MOUNTING AND CONFIGURATION
Site 2: VOITH GROUP - JABEL ALI INDUSTRIAL AREA
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005370
CAMERA CABLING AS PER SIRA
👤 Bashir Hussain (Sr. Electrician)
Site 1: G4S DIB BANK - DEIRA
⏱️ 09:00 AM - 06:00 PM
Project, ELV 📦 Delivered
DEVICE BOX MOUNTING AND TERMINATION
Site 2: VOITH GROUP - JABEL ALI INDUSTRIAL AREA
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005370
CAMERA CABLING AS PER SIRA
👤 Burhan Jawala (Electrician)
Site 1: CLOUD SPACE RAK - RAK
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office
AP AND USER END TERMINATION
Site 2: CLOUD SPACE RAK - RAK
⏱️ 11:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office
SPEAKER MOUNTING AND USER END TERMINATION
👤 Firdous Kunju (Project Engineer)
Site 1: Al Durrah International School - https://g.co/kgs/nJkydZJ
⏱️ 11:00 AM - 01:00 PM
Site Visit 📦 No Material
Meeting for Network requirements.
Site 2: SISL Infotech (UK) LTD - Gate Village 05, Level 1, Zabeel Second, Dubai
⏱️ 06:00 PM - 03:00 AM
On Call BCQ: BCQ/2026/005521
Onsite Support for - NIM relocation, including removing the existing cards and relocating the cards currently installed in Router 2 to Router 1 and positioning 1 card to its correct slot within Router 2. - Relocating the Zayo and Colt cable connections to the newly installed NIM. - Assisting with testing and validation activities • Activity Date: Wednesday, 9 September 2026 • Activity Time: 5:00 PM to 3:00 AM (Dubai local time) • Site: Wells Fargo – Dubai Rep Office • Location: Gate Village 05, Level 1, Zabeel Second, Dubai
👤 Firoz Mandiwala (Sr. Support Engineer)
Site 1: EGYCON CONTRACTING L.L.C - MAZAYA BUSINESS CENTRE UNIT 3001 & 3002
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005485
CAMERA AND TELEPHONE CABLING
👤 Hussain Bandookwala (Project Engineer)
Site 1: ASAS AL AFIA MEDICAL - DAHID
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/004106
DEVICE MOUNTING AND CONFIGURATION
Site 2: VOITH GROUP - JABEL ALI INDUSTRIAL AREA
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005370
CAMERA CABLING AS PER SIRA
👤 Huzaifa Raja (Sr. Project Engineer)
Site 1: G4S DIB BANK - DEIRA
⏱️ 09:00 AM - 06:00 PM
Project, ELV 📦 Delivered
DEVICE BOX MOUNTING AND TERMINATION
👤 Imran Ahmed (Sr. Electrician)
Site 1: MUTEENA BUILDING WORKS - NEAR SALAHUDDIN METRO 602 ROOM NUMBER
⏱️ 09:20 AM - 06:00 PM
Project, ELV 📦 Delivered
CABLING WORK RAJVEER SALES PERSON
Site 2: ASAS AL AFIA MEDICAL - DAHID
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/004106
DEVICE MOUNTING AND CONFIGURATION
👤 Jamil Akhtar (Sr. Electrician)
Site 1: ORASCOM - HMFZA SHARJAH
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 Delivered
TERMIATION AND LABELING WORK
Site 2: EGYCON CONTRACTING L.L.C - MAZAYA BUSINESS CENTRE UNIT 3001 & 3002
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005485
CAMERA AND TELEPHONE CABLING
👤 Joe Myo (Support Engineer)
Site 1: Emirates Kitchen Equipment Co. L.L.C - Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai
⏱️ 09:00 AM - 02:00 PM
AMC 📦 No Material
Setup the systems for the users and internet connectivity issues.
👤 John Louis (Support Engineer)
Site 1: Golden Falcon General Trading LLC - Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE
⏱️ 09:00 AM - 12:00 PM
AMC 📦 No Material
Check and rectify the network issues.
👤 Jonathan Tolentino (Support Engineer)
Site 1: Golden Falcon General Trading LLC - Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE
⏱️ 09:00 AM - 12:00 PM
AMC 📦 No Material
Check and rectify the network issues.
👤 Maninder Singh (Helper)
Site 1: G4S DIB BANK - DEIRA
⏱️ 09:00 AM - 06:00 PM
Project, ELV 📦 Delivered
DEVICE BOX MOUNTING AND TERMINATION
Site 2: EGYCON CONTRACTING L.L.C - MAZAYA BUSINESS CENTRE UNIT 3001 & 3002
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005485
CAMERA AND TELEPHONE CABLING
👤 Miles Yvo (Support Engineer)
Site 1: Steki Restaurant - Courtyard, first level, Al Marina - Abu Dhabi - United Arab
⏱️ 09:00 AM - 06:00 PM
AMC 📦 No Material
Preventive Maintenance
👤 Omprakash Nokhwal (Sr. Electrician)
Site 1: CLOUD SPACE RAK - RAK
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office
AP AND USER END TERMINATION
Site 2: CLOUD SPACE RAK - RAK
⏱️ 11:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office
SPEAKER MOUNTING AND USER END TERMINATION
👤 Rajakumar Selvaraj (Helper)
Site 1: G4S DIB BANK - DEIRA
⏱️ 09:00 AM - 06:00 PM
Project, ELV 📦 Delivered
DEVICE BOX MOUNTING AND TERMINATION
Site 2: VOITH GROUP - JABEL ALI INDUSTRIAL AREA
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 To be collected from office BCQ: BCQ/2026/005370
CAMERA CABLING AS PER SIRA
👤 Rajveer Raiya (Project Engineer)
Site 1: IMBA Building Materials Trading LLC - https://share.google/0x67waxq4s9ftHQqS
⏱️ 09:00 PM - 06:00 PM
AMC 📦 No Material
AMC IT Audit. mai@imbauae.com +971 56 540 4500 Ras Al Khaimah, United Arab Emirates | P.O. Box 834
👤 Sachin Mohandas (Project Engineer)
Site 1: Al Massa Architectural General Contracting L.L.C - https://www.google.com/maps?q=24.221372604370117,55.763607025146484&z=17&hl=en
⏱️ 09:00 AM - 12:00 PM
Site Visit 📦 No Material
Meeting for Project implementation.
👤 Shoaib Qureshi (Electrician)
Site 1: MUTEENA BUILDING WORKS - NEAR SALAHUDDIN METRO 602 ROOM NUMBER
⏱️ 09:20 AM - 06:00 PM
Project, ELV 📦 Delivered
CABLING WORK RAJVEER SALES PERSON
Site 2: ORASCOM - HMFZA SHARJAH
⏱️ 10:00 AM - 06:00 PM
Project, ELV 📦 Delivered
TERMIATION AND LABELING WORK

📊 Management Historical Search Report Engine

Engineer Name(s) Client Name Location Details Target Date Shift Hours Scope of Work (SOW) Classification Material Status BCQ Quote Dispatcher Status
Abbas Khan, Jim Gipson, Waqas Parvez Chauhdry PWS Gulf Insurance Brokers LLC Office Nos. MR4 & MR5 GR5 Wafi Residence Building Umm Hurrair 2 UAE 15-Aug-26 09:00:00 - 18:00:00 PROFESSIONAL SERVICE Data cabling, termination, testing, tracing and labelling including cables and materials x9 points Project ADQ/2026/000636 Antonio Active
Abdeali Bhanpurawala Mesco Marine Services: Shipchandler https://maps.app.goo.gl/PDHjXeLiporw3mp7A?g_st=iw 04-Sep-26 09:00:00 - 18:00:00 Check and rectify the Wifi issues. Preventive Maintenance. AMC No Material - Antonio Active
Abdeali Bhanpurawala Broadway Interiors LLC Grosvenor Business Tower, 1512 - Barsha Heights - Dubai 25-Aug-26 09:00:00 - 18:00:00 Antivirus installation and license update. AMC - Antonio Active
Abdeali Bhanpurawala Comfort Inn Hotel https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 24-Aug-26 09:00:00 - 12:00:00 AMC IT audit. Company Name : Comfort Inn Hotel Contact Person : Mr. Rony Philip Contact No : 0567496461 Email ID : it@hotelcomfortinn.com Location : https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 AMC - Antonio Active
Abdeali Bhanpurawala Investra Investments LLC https://maps.app.goo.gl/iyPbvsqadzxfS5kB9 19-Aug-26 14:00:00 - 18:00:00 PC Diagnosis (Savita's PC). Address: Office 124, The Iridium Building Umm Suqeim Street, Al Barsha 1 P.O. Box: 112438 Dubai, United Arab Emirates Contact Person: Ms. Vivet Colaco Contact no: 04-4380211 On Call BCQ/2026/005012 Antonio Active
Abdeali Bhanpurawala TARTAN GLOBAL General Trading L.L.C. 3306, Concord Tower Media City Dubai 416130 United Arab Emirates 17-Aug-26 14:00:00 - 18:00:00 - Preventive Maintenance. - Antivirus Installation. AMC - Antonio Active
Abdullah Sethwala Dar Al Rokham LLC https://maps.app.goo.gl/X1LtDvvyLnvxtXuj8 09-Sep-26 09:00:00 - 18:00:00 Granstream Phone Installation and configuration. Project No Material LCSQ/2026/000949 Antonio Active
Abdullah Sethwala AL MANARAH INSURANCE SERVICES CO. LLC Buhaira Tower, 3rd Floor, Office No. 301 & 302, Buhaira Corniche, Sharjah 03-Sep-26 12:00:00 - 13:00:00 FIREWALL INSTALLATION AND MIGRATION WITH ALL THE REQUIRED MATERIAL INCLUDING FORTICONVERTER Contact details: "Maroun G. Challita" <mgchallita@almanarahinsurance.ae> M +971 58 581 6441 Al Manarah Insurance Services Co. Chedid Insurance Brokers Buhaira Tower, 3rd Floor, Office No. 301 & 302, Buhaira Corniche, Sharjah T+971 6 5444660 Project To be collected from office BCQ/2026/002922 Antonio Active
Abdullah Sethwala, Rajveer Raiya WILD Flavors Middle East FZE https://maps.app.goo.gl/ZLW2gVUCZSPzajh16 31-Aug-26 09:00:00 - 12:00:00 IT Induction for Support. WILD FLAVORS MIDDLE EAST FZE CAPRI SUN BLDG PLOT S-10805 STREET S111 P.O. BOX 261060 JEBEL ALI FREE ZONE SOUTH DUBAI, UAE Pacita Carlos: +971 50 5598928 AMC No Material - Antonio Active
Abdullah Sethwala BRASS MONKEY COMPANY LTD https://maps.app.goo.gl/HP7pphvModW1uapt8 25-Aug-26 14:00:00 - 18:00:00 - 3CXNAE16M12 - 3CX Phone System AI Edition - Annual 3CX Phone System AI 16 SC (max 80 extensions). - Installation and configuration 7 Room integration charges for 1 location (remote support) Per hour per location. - Grandstream Gateway ucm6300a Swaraj Brass Monkey +971 50 413 4890 Project LCSQ/2026/000939 Antonio Active
Abdullah Sethwala ALTIUS Collective Bluechip Office 20-Aug-26 11:00:00 - 14:00:00 scope of work : Review existing Microsoft 365 Family account setup. Verify the files need to migrate and take backup. Configure and activate the new Microsoft 365 Business account. Migrate user data and OneDrive content to the new account without data loss. Reconfigure Microsoft Office applications, Outlook, and OneDrive. Verify successful synchronization and access to files after migration. Perform post-migration testing and user assistance. Exclusions Microsoft 365 license subscription costs. Recovery of deleted, corrupted, or inaccessible data. Third-party application migration or configuration. Operating system, hardware, or laptop performance issues. Onsite support. Claire Clinton: +971561310967 On Call BCQ/2026/005029 Antonio Active
Abdullah Sethwala BRASS MONKEY COMPANY LTD https://maps.app.goo.gl/HP7pphvModW1uapt8 17-Aug-26 09:00:00 - 18:00:00 - 3CXNAE16M12 - 3CX Phone System AI Edition - Annual 3CX Phone System AI 16 SC (max 80 extensions). - Installation and configuration 7 Room integration charges for 1 location (remote support) Per hour per location. - Grandstream Gateway ucm6300a Swaraj Brass Monkey +971 50 413 4890 Project LCSQ/2026/000939 Antonio Active
Abdullah Sethwala ABD ULWAHED BIN SHABIB INVESTMENT GROUP L.L.C Bin shabib mall, Block -3 A1 Qusais, Industrial Area 1, Dubai , UAE 15-Aug-26 09:00:00 - 18:00:00 Firewall and Switch reconfiguration. Bin shabib mall, Block -3 A1 Qusais, Industrial Area 1, Dubai , UAE Phone :+971 504865536 AMC - Antonio Active
Akhil Dev Berkshire Hathaway Specialty Insurance Company Level 21, Offices 2103, 2104 & 2105, Index Tower, DIFC, PO Box 506861, Dubai, UAE 09-Sep-26 14:00:00 - 18:00:00 Audit for the laptops. AMC No Material - Antonio Active
Akhil Dev CLYMET LOGISTICS LLC M 21, Al Qusais, Al Qusais Dubai United Arab Emirates 09-Sep-26 21:00:00 - 12:00:00 Check and rectify the Wifi Issues. AMC No Material - Antonio Active
Akhil Dev Ikan Manufacturing LLC https://maps.app.goo.gl/C6iGFWEjKdPhhDwg9 03-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance. AMC No Material - Antonio Active
Akhil Dev, Shoaib Qureshi Quirónsalud Specialty Hospital https://share.google/VlfvVmuPUhvNlwsk1 27-Aug-26 08:00:00 - 12:00:00 SOW:Credence System Check the EID card reader connectivity issues. Address: Villa 1187, 304 Al Wasl Road, Umm Al Sheif District, Dubai, UAE. Tel: +971 4 3422228 AMC - Antonio Active
Akhil Dev Comfort Inn Hotel https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 26-Aug-26 09:00:00 - 12:00:00 AMC IT audit. Company Name : Comfort Inn Hotel Contact Person : Mr. Rony Philip Contact No : 0567496461 Email ID : it@hotelcomfortinn.com Location : https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 AMC - Antonio Active
Akhil Dev Emirates Kitchen Equipment Co. L.L.C Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai 25-Aug-26 12:00:00 - 18:00:00 Setup the systems for the users x 2. AMC - Antonio Active
Akhil Dev EDGE - S.C.M. BUILDING CONTRACTING LLC https://maps.app.goo.gl/yMChdx4G5haXshHd6 22-Aug-26 09:00:00 - 12:00:00 AutoCad Installation. Address: 302 AL MAKTAB BUILDING Phone: 0545148941 https://maps.app.goo.gl/yMChdx4G5haXshHd6 AMC - Antonio Active
Akhil Dev Engineering Techniques Services: Dubai Branch https://maps.app.goo.gl/a2z6LnHCbrqqadiR9 21-Aug-26 09:00:00 - 12:00:00 Preventive Maintenance AMC - Antonio Active
Akhil Dev MyPediaClinic https://share.google/NPb7dOInXN8iBCjm1 21-Aug-26 14:00:00 - 18:00:00 - Preventive Maintenance. - Check the scanner issues. AMC - Antonio Active
Akhil Dev, Jonathan Tolentino Quirónsalud Specialty Hospital https://share.google/VlfvVmuPUhvNlwsk1 20-Aug-26 09:00:00 - 12:00:00 SOW:Credence System Check the EID card reader connectivity issues. Address: Villa 1187, 304 Al Wasl Road, Umm Al Sheif District, Dubai, UAE. Tel: +971 4 3422228 AMC - Antonio Active
Akhil Dev Emirates Kitchen Equipment Co. L.L.C Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai 20-Aug-26 14:00:00 - 18:00:00 Setup the systems for the users x 2. AMC - Antonio Active
Akhil Dev Chartered Institute of Procurement and Supply 25th Floor Burj Al Salam Bldg., Sheikh Zayed Road, PO 74327 Dubai, United Arab Emirates 19-Aug-26 09:00:00 - 14:00:00 System setup for the user. AMC - Antonio Active
Akhil Dev Quirónsalud Specialty Hospital https://share.google/VlfvVmuPUhvNlwsk1 18-Aug-26 09:00:00 - 12:00:00 SOW:Credence System Check the EID card reader connectivity issues. Address: Villa 1187, 304 Al Wasl Road, Umm Al Sheif District, Dubai, UAE. Tel: +971 4 3422228 AMC - Antonio Active
Akhil Dev MEHITS Middle East, FZCO WA 519 DAFZA, Dubai UAE PO BOX 54284 17-Aug-26 09:00:00 - 12:00:00 Preventive Maintenance & Shared Folder issues. AMC - Antonio Active
Akhil Dev ACAD https://share.google/2QTc5m6VZazKwtjCF 15-Aug-26 09:00:00 - 18:00:00 Scope of Work: During normal working hours SIP trunk configuration on Grandstream UCM6308 Softphone extension creation and configuration User testing for incoming and outgoing calls Basic call routing configuration Handover after successful testing Exclusion: • Existing analog PABX configuration or modification is not included in the scope. • Cabling, Civil work, Electrical work Client Contact: • Company: ACAD • Contact Person: Mr. Omar • Mobile: +971 50 564 5633 • Location : Akkad Pest Control Services Office 403 • https://share.google/2QTc5m6VZazKwtjCF Project, On Call BCQ/2026/004605 Antonio Active
Akhil Dev Al Taher & Al Sabri Advocates https://www.google.com/maps?q=25.2412679,55.2723018&z=17&hl=en 13-Aug-26 09:00:00 - 12:00:00 Prosfessional service charges - Checking & Rectification of no incoming & outgoing issue with Avaya phone Client Details: Al Taher & Al Sabri Advocates Al Hudaibah Awards Building(B- Block) Block B6 Floor, Office 618-620 Location: https://www.google.com/maps?q=25.2412679,55.2723018&z=17&hl=en Contact Person – Ms. Sarra +971 50 884 2976 On Call BCQ/2026/004774 Antonio Active
Akhil Dev PERIPHERALS AND PARTS TRADING LLC Khalid Bin Waleed Road Al Zarooni Building Office # 103, Opposite Panorama Grand Hotel Bur Dubai Dubai 13-Aug-26 12:00:00 - 18:00:00 Testing of Telephone lines for Outgoing issues. Project BCQ/2026/002930 Antonio Active
Akhil Dev Al Tayer Stocks LLC 42nd Floor, Ubora Tower, Business Bay 12-Aug-26 09:00:00 - 12:00:00 Matrix Device configuration. Regards Mohd Tariq Al Tayer Stocks LLC T: +971 4 503 4834 / +971 56 206 2311 Project BCQ/2026/001633 Antonio Active
Akhil Dev SNASH Car Care https://maps.app.goo.gl/ZUhYgxnGaFVNpTrB6 12-Aug-26 14:00:00 - 18:00:00 Check and rectify the 3CX issues. Location: https://maps.app.goo.gl/ZUhYgxnGaFVNpTrB6 Contact: Munaver Mob: +971 55 119 8678 On Call BCQ/2026/004654 Antonio Active
Akhil Dev MyPediaClinic https://share.google/NPb7dOInXN8iBCjm1 11-Aug-26 09:00:00 - 12:00:00 Preventive Maintenance. Address: Building 64 - Al Razi Building No 64 Block B First Floor Unit 1011 Dubai Health Care City - Block B - 1101 - Umm Hurair Second - Dubai Phone: 055 931 1752 AMC - Antonio Active
Akhil Dev Comfort Inn Hotel https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 11-Aug-26 14:00:00 - 18:00:00 Check and rectify the phone issues. Company Name : Comfort Inn Hotel Contact Person : Mr. Rony Philip Contact No : 0567496461 Email ID : it@hotelcomfortinn.com Location : https://maps.app.goo.gl/KjKoDuT8D6BinVwD6 AMC - Antonio Active
Akhil Dev FN ARCHITECTS L.L.C. https://maps.app.goo.gl/kYdXn21U3es9XZj96 10-Aug-26 10:00:00 - 18:00:00 Professional Services ONSITE SUPPORT: • Remap existing server shared folders and network drives on 1 new laptops. • Perform physical cleaning of 10 desktop PCs. NOTE: -During normal office hours. -One time visit only. Risk Disclaimer – Desktop Cleaning Service During the internal cleaning of desktop computers using a blower, there is a possibility that older hardware components, particularly aging power supply units (PSUs), may fail or become non-functional due to their existing condition. Dust removal can expose or accelerate pre-existing faults that were not previously apparent. While every precaution will be taken to perform the cleaning safely and in accordance with industry best practices, the service provider cannot be held responsible for hardware failures resulting from the age, wear, or pre-existing condition of the equipment. This includes, but is not limited to, systems that fail to power on or experience power supply failure following the cleaning process. Any hardware replacement or repair required as a result of such preexisting conditions will be treated as additional work and will be quoted separately upon customer approval. H. IZZA RAMIREZ EXECUTIVE ASSISTANT +971 50 727 9730 On Call BCQ/2026/004337 Antonio Active
Ali Asgar, Hussain Bandookwala, Imran Ahmed ASAS AL AFIA MEDICAL DAHID 09-Sep-26 10:00:00 - 18:00:00 DEVICE MOUNTING AND CONFIGURATION Project, ELV To be collected from office BCQ/2026/004106 Moiz Active
Ali Asgar, Bashir Hussain, Hussain Bandookwala, Rajakumar Selvaraj VOITH GROUP JABEL ALI INDUSTRIAL AREA 09-Sep-26 10:00:00 - 18:00:00 CAMERA CABLING AS PER SIRA Project, ELV To be collected from office BCQ/2026/005370 Moiz Active
Ali Asgar, Bashir Hussain VITAMIN STAND DIC 05-Sep-26 02:00:00 - 18:00:00 PUNCH IN / OUT DEVICE NOT WORKING Project, ELV No Material - Antonio Active
Ali Asgar, Bashir Hussain, Hussain Bandookwala AESG IBN BATUTA GATE 05-Sep-26 10:00:00 - 18:00:00 UPS AND BATTERY FIXING Project, ELV Delivered BCQ 2026 003832 Antonio Active
Ali Asgar, Firoz Mandiwala, Imran Ahmed, Shoaib Qureshi SHINHAN BANK DIFC 04-Sep-26 10:00:00 - 18:00:00 CAMERA CABLING AND FIXING FOCUSING Project, ELV To be collected from office BCQ/2026/005180 Moiz Active
Ali Asgar, Bashir Hussain, Firoz Mandiwala NEW DOOR REAL ESTATE WORLD TRADE CENTRE 03-Sep-26 03:00:00 - 18:00:00 DOOR ACCESS CONTROL ISSUE Project, ELV No Material BCQ 2026 005217 Moiz Active
Ali Asgar, Bashir Hussain, Firoz Mandiwala MONZO TECHNOLOGY , UNISYNC CUSTOMER CARE DUBAI INTERNATIONAL CITY 03-Sep-26 10:00:00 - 14:00:00 BOTH COMPANIES HAVING BIOMETRIC ISSUE Project, ELV No Material LCQ 2026 001252 Moiz Active
Ali Asgar, Imran Ahmed, Imran Khan INTEGERATED PLASTICS DIC 02-Sep-26 10:00:00 - 18:00:00 CAMERA RECTIFICATION Project, ELV No Material - Moiz Active
Ali Asgar, Firoz Mandiwala, Imran Ahmed FUELING JLT DMCC 01-Sep-26 14:30:00 - 18:00:00 CAT6 CABLING AND PUSH BUTTON FIXING Project, ELV To be collected from office BCQ 2026 005244 Moiz Active
Ali Asgar, Huzaifa Raja, Imran Ahmed ROYAL PETS VETERINARY GARHOUD 01-Sep-26 22:00:00 - 14:00:00 2 CAMERA CABLING AND CONFIGURATION Project, ELV To be collected from office BCQ 2026 005270 Moiz Active
Ali Asgar, Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal CLOUD SPACE RAK RAK 31-Aug-26 11:00:00 - 18:00:00 DEVICE MOUNTING Project, ELV - Moiz Active
Ali Asgar, Bashir Hussain, Firoz Mandiwala LIBERTY ROYAL TIRES AND AUTO SERVICES L.L.C ALQUOZ 29-Aug-26 08:00:00 - 15:00:00 CAMERA 7 QTY Project, ELV Delivered LCSQ/2026/000951 Antonio Active
Ali Asgar, Bashir Hussain, Firoz Mandiwala SICURO BUSINESS 29-Aug-26 15:00:00 - 18:00:00 CABLING Project, ELV Delivered - Antonio Active
Ali Asgar, Hussain Bandookwala, Imran Ahmed SHINHAN BANK Office 2701, Boulevard Plaza Tower 1, Downtown, Dubai, UAE 27-Aug-26 09:00:00 - 18:00:00 CAMERA WORK Project, ELV To be collected from office BCQ/2026/004144, BCQ/2026/004666 Moiz Active
Ali Asgar, Hussain Bandookwala, Imran Ahmed SHINHAN BANK DIFC 26-Aug-26 09:00:00 - 18:00:00 CCTV Cabling and Camera Installation. HDMI cable pulling Project, ELV BCQ/2026/004144, BCQ/2026/004666 Moiz Active
Ali Asgar, Hussain Rangwala, Jaffer Mohamed, Omprakash Nokhwal Cloud Spaces - Al Hamra RAK https://maps.app.goo.gl/AMizd6bun3Akv1ZH6 15-Aug-26 09:00:00 - 18:00:00 Office Setup: - Rack Management. - Cabling. - IT Device installation Project BCQ/2026/003249 Antonio Active
Antonio Fernandes, Firdous Kunju Cloud Spaces - Al Hamra RAK https://maps.app.goo.gl/AMizd6bun3Akv1ZH6 03-Sep-26 08:00:00 - 12:00:00 Weekly Project Meeting. Public IP configuration to the spare router. Project No Material BCQ/2026/003249 Antonio Active
Bashir Hussain, Huzaifa Raja, Maninder Singh, Rajakumar Selvaraj G4S DIB BANK DEIRA 09-Sep-26 09:00:00 - 18:00:00 DEVICE BOX MOUNTING AND TERMINATION Project, ELV Delivered - Moiz Active
Bashir Hussain, Hussain Bandookwala, Rajakumar Selvaraj DAR AL ROKHAM DIP 04-Sep-26 10:00:00 - 18:00:00 SWITCH MOUNTING TELEPHONE CONFIGURATION Project, ELV To be collected from office LCSQ/2026/001008 LCSQ/2026/001010 Moiz Active
Bashir Hussain, Firoz Mandiwala BMS PRODUCTION CITY 02-Sep-26 04:00:00 - 18:00:00 CARD READER POWER ISSUE RECTIFICATION Project, ELV No Material - Moiz Active
Bashir Hussain, Firoz Mandiwala BurjX Mena Limited BUSINESS BAY 02-Sep-26 10:00:00 - 12:00:00 REMOTE CONTROL INSTALLATIO AND SOFTWARE INSTALLATION Project, ELV Delivered - Moiz Active
Bashir Hussain, Firoz Mandiwala RIGHTEIOUS PROPERTIES AL BARSHA 02-Sep-26 13:30:00 - 15:00:00 DOOR ACCESS RECTIFICATION Project, ELV - Moiz Active
Bashir Hussain, Firoz Mandiwala AS SCALFHOLDING RAS AL KHOR 01-Sep-26 10:00:00 - 12:00:00 CAMERA NOT WORKING Project, ELV No Material - Moiz Active
Bashir Hussain, Hussain Bandookwala, Maninder Singh BIKANERWALA JLT JLT DMCC 01-Sep-26 10:00:00 - 18:00:00 CAMERA WORK FIXING FOCUSING Project, ELV To be collected from office - Moiz Active
Bashir Hussain, Hussain Bandookwala, Maninder Singh BIKANERWALA JLT JLT DMCC 31-Aug-26 09:00:00 - 18:00:00 CAMERA CABLING WORK Project, ELV To be collected from office BCQ 2026 005170 Moiz Active
Bashir Hussain, Firoz Mandiwala, Rajakumar Selvaraj RAD STAR SINGLE BUSINESS TOWER 2404 27-Aug-26 10:00:00 - 14:00:00 4 CAMERA CABLING AND FIXING FOCUSING Project, ELV To be collected from office LCSQ 2026 000987 Moiz Active
Bashir Hussain, Huzaifa Raja, Rajakumar Selvaraj SICURO DUBAI JLT 27-Aug-26 15:00:00 - 18:00:00 RACK DEVICE SHIFITING Project, ELV Delivered - Moiz Active
Bashir Hussain, Huzaifa Raja, Rajakumar Selvaraj SICURO Dubai 26-Aug-26 09:00:00 - 18:00:00 Cat6 cabling x 5. Project, ELV BCQ/2026/004553 Moiz Active
Bashir Hussain, Huzaifa Raja, Rajakumar Selvaraj DPS School Delhi Private School Dubai, D 51 - near Ibn Batuta Mall - Jabal Ali First - The Gardens - Dubai 15-Aug-26 09:00:00 - 18:00:00 Camera Configuration & focusing. Project LCSQ/2026/000806 Antonio Active
Burhan Jawala, Omprakash Nokhwal CLOUD SPACE RAK RAK 09-Sep-26 10:00:00 - 18:00:00 AP AND USER END TERMINATION Project, ELV To be collected from office - Moiz Active
Burhan Jawala, Omprakash Nokhwal CLOUD SPACE RAK RAK 09-Sep-26 11:00:00 - 18:00:00 SPEAKER MOUNTING AND USER END TERMINATION Project, ELV To be collected from office - Moiz Active
Burhan Jawala, Omprakash Nokhwal SNG DEIRA NEAR CITY CENTRE 05-Sep-26 09:30:00 - 18:00:00 CABLE EXTENSION AND CABLE TERMINATION Project, ELV To be collected from office - Antonio Active
Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal CLOUD SPACE RAK RAK 04-Sep-26 10:00:00 - 18:00:00 ONGOING PROJECT Project, ELV No Material - Moiz Active
Burhan Jawala, Omprakash Nokhwal CLOUD SPACE RAK RAK 03-Sep-26 10:00:00 - 18:00:00 EXISTING WORK Project, ELV No Material - Moiz Active
Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal CLOUD SPACE RAK RAK 02-Sep-26 10:00:00 - 18:00:00 PROJECT CONTINUING Project, ELV Delivered - Moiz Active
Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal CLOUD SPACE RAK RAK 01-Sep-26 10:30:00 - 18:00:00 DEVICE MOUNTING AP CAMERA AND RACK SIDE CABLE TERMINATION AND CABLE MANAGEMENT Project, ELV Delivered - Moiz Active
Burhan Jawala, Hussain Rangwala, Rajakumar Selvaraj Delta Foods SHARJAH_ FREEZONE 29-Aug-26 10:00:00 - 18:00:00 CAMERA FOCUSING CONFIGURATION Project, ELV Delivered - Moiz Active
Burhan Jawala, Hussain Rangwala, Jaffer Mohamed, Jamil Akhtar Nucleos Group FZC HMFZA SHARJAH 27-Aug-26 09:00:00 - 18:00:00 CAMERA UPLINK CABLING FIXING FOCUSING Project, ELV Delivered LCQ/2026/001182 Moiz Active
Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal Delta Foods Sharza-Freezone 26-Aug-26 09:00:00 - 18:00:00 Cat6 Cabling and camera focousing. Project, ELV LCQ/2026/001026 Moiz Active
Burhan Jawala, Hussain Rangwala, Omprakash Nokhwal MARTIN HUELLE SHARJAH_ FREEZONE 26-Aug-26 16:00:00 - 18:00:00 3 CAMERA CHANGING CONFIGURATION AND FOCUSING Project, ELV LCQ/2026/001203 Moiz Active
Burhan Jawala, Firdous Kunju, Hussain Bandookwala, Jamil Akhtar, Jonathan Tolentino, Shoaib Qureshi Maples Fund Services (Middle East) Limited Level 14 Burj Daman, Dubai International Financial Centre, PO Box 506734 Dubai, United Arab Emirates 15-Aug-26 08:00:00 - 18:00:00 Rack Management. Mark Anthony Bagunu: +971 56 413 1551 Project BCQ/2026/000811 Antonio Active
Firdous Kunju Al Durrah International School https://g.co/kgs/nJkydZJ 09-Sep-26 11:00:00 - 13:00:00 Meeting for Network requirements. Site Visit No Material - Antonio Active
Firdous Kunju SISL Infotech (UK) LTD Gate Village 05, Level 1, Zabeel Second, Dubai 09-Sep-26 18:00:00 - 03:00:00 Onsite Support for - NIM relocation, including removing the existing cards and relocating the cards currently installed in Router 2 to Router 1 and positioning 1 card to its correct slot within Router 2. - Relocating the Zayo and Colt cable connections to the newly installed NIM. - Assisting with testing and validation activities • Activity Date: Wednesday, 9 September 2026 • Activity Time: 5:00 PM to 3:00 AM (Dubai local time) • Site: Wells Fargo – Dubai Rep Office • Location: Gate Village 05, Level 1, Zabeel Second, Dubai On Call BCQ/2026/005521 Antonio Active
Firdous Kunju Alchemy Trading Global Markets LLC https://maps.app.goo.gl/ev84K8vkhqwX9f8U7 08-Sep-26 10:00:00 - 12:00:00 Site Visit for Project implementation. Concord Tower, Office 3807-3809, Media City, Dubai, UAE Location Map: https://maps.app.goo.gl/ev84K8vkhqwX9f8U7 Project No Material BCQ/2026/005033 Antonio Active
Firdous Kunju The Philippine School The Philippine School - Muhaisanah Second - Muhaisanah 2 - Dubai 07-Sep-26 09:00:00 - 12:00:00 VLAN Configuration. AMC - Antonio Active
Firdous Kunju MECAKA IT INFRASTRUCTURE L.L.C https://maps.app.goo.gl/nboQbx4sj5ULRQ5J9 05-Sep-26 11:00:00 - 14:00:00 Installation & Configuration of Phones. Company Name: MECAKA IT INFRASTRUCTURE L.L.C Contact Person: Ms. Nicole Email Address: NA Contact Number: +971 55 822 5327 Site Google Map Location: https://maps.app.goo.gl/nboQbx4sj5ULRQ5J9 NAV Capital, office number : 509, Burj Daman, DIFC Project No Material BCQ/2026/004064 Antonio Active
Firdous Kunju, Jamil Akhtar Sicuro Group LLC https://maps.app.goo.gl/X6KP8pgsgVPUNKjB7 04-Sep-26 09:00:00 - 13:00:00 Installation of the devices. Old Office: 1703 One by Omniyat, Business Bay, Dubai, UAE New Office: Office 104, M Square building, Mankhool,UAE +971 54 266 9808 Rem +971 55 154 7605 jelard Project No Material BCQ/2026/004553 Antonio Active
Firdous Kunju Araneae Communication Networks Installation LLC https://share.google/GYbGMcxPaRUQUBGJ0 04-Sep-26 15:00:00 - 18:00:00 PROFESSIONAL SERVICE Scope of Work: Firewall Migration & VPN Configuration: Migration from the existing FortiGate 30E to the new FortiGate 50G, including backup and restoration of the existing configuration, migration of firewall policies, security profiles, NAT, routing, VLANs, DHCP, and internet settings. Reconfigure and migrate all existing SSL/IPsec VPN users, user groups, VPN policies, and required firewall policies to ensure secure remote access to internal resources. Perform end-to-end testing, validate internet and VPN connectivity, and provide post-migration support to ensure a smooth transition with minimal downtime. Location : Silicon Oasis https://share.google/GYbGMcxPaRUQUBGJ0 Contact person: Ahmad +971 55 799 7697 Project No Material BCQ/2026/005076 Antonio Active
Firdous Kunju Metal Fabrik FZ LLC https://maps.app.goo.gl/81ponNZYCYDCujFXA?g_st=awb 03-Sep-26 14:00:00 - 18:00:00 Removal of old firewall, Installation & configuration of new firewall with VPN setup Location - https://maps.app.goo.gl/81ponNZYCYDCujFXA?g_st=awb Contact - Mr Dixon Contact No. - +971 56 680 8547 Project To be collected from office BCQ/2026/004925 Antonio Active
Firdous Kunju VEEDOL INTERNATIONAL DMCC Unit No. 1501, Indigo Icon, Cluster F, JLT, P.O. Box 117019, Dubai, U.A.E. 02-Sep-26 09:00:00 - 18:00:00 - NAS HDD replacement. - Preventive Maintenance. AMC, Project Delivered - Antonio Active
Firdous Kunju Airbus Africa & Middle East FZE https://share.google/fm5ZAspEboMWzPisl 01-Sep-26 09:00:00 - 12:00:00 Installation and Configuration for Cloud Key Ultimate End Username Airbus Africa & Middle East FZE Address Line 1 Dubai Airport Free Zone Address Line 2 West Wing 8, 6th & 7th Floor City Dubai PO. Box 54341 End User Contact Person Sandeep Balakrishnan Job Title IT Mobile No. +971 56 533 3179 Project To be collected from office BCQ/2026/005215 Antonio Active
Firdous Kunju NET FOR CHOICE GULF CLOUD SERVICE & DATACENTERS PROVIDERS L.L.C https://share.google/Q6Jik8SyVxkR84s5Y 31-Aug-26 09:00:00 - 10:00:00 NAS faulty HDD replacement. AMC To be collected from office - Antonio Active
Firdous Kunju Emirates Business Management International Consultants Office 2510, Burlington Tower Marasi Drive, Business Bay Dubai UAE 31-Aug-26 12:00:00 - 18:00:00 PROFESSIONAL SERVICE SOW: During normal working hours Migration of the existing firewall configuration, policies, VPN settings, NAT rules, and security services from , including installation, configuration, testing, and smooth cutover with minimal downtime. Note: Client shall provide the existing firewall configuration in advance to enable migration preparation and configuration activities at our office, helping to minimize downtime during the on-site implementation. Excluded: Cabling , Civil work, Electrical work Note: AMC tickets will be utilized. Project To be collected from office BCQ/2026/003936 Antonio Active
Firdous Kunju, Jonathan Tolentino Golden Falcon General Trading LLC Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE 29-Aug-26 09:00:00 - 18:00:00 Check and rectify the network issues. AMC No Material - Antonio Active
Firdous Kunju LEOS DEVELOPMENT LLC https://maps.app.goo.gl/n6pkEQs7wmuMdZmA6 26-Aug-26 09:00:00 - 18:00:00 Scope of work: Supply, installation, configure, and commission one Dell PowerEdge R760xs server to operate alongside the existing production server. The new server will be configured as an Additional Domain Controller (ADC), File Server, and Backup Server with dedicated data and backup storage. Hardware Configuration Server • Dell PowerEdge R760xs Rack Server • Intel Xeon Silver • 64 GB DDR5 ECC RAM (2x32)(Expandable) • Dual Redundant Power Supplies • iDRAC Enterprise Management Operating System Storage • 2 × 960 GB Enterprise SSD • RAID 1 Configuration Data Storage • 4 × 8 TB Enterprise NL-SAS HDD • RAID 5 Configuration • Dedicated for production data and shared folders Backup Storage • 4 × 8 TB Enterprise NL-SAS HDD • RAID 5 Configuration • Dedicated backup repository ______________ Scope of Installation 1. Physical Installation • Rack mounting of server • Power connection to redundant power supplies • Cable management • Network cabling • Hardware inspection 2. Firmware Configuration • BIOS Update • iDRAC Configuration • Firmware Updates • Hardware Diagnostics 3. RAID Configuration Operating System • Configure RAID 1 for 2 × 960 GB SSD Data Storage • Configure RAID 5 using 3 × 8 TB HDD Backup Storage • Configure RAID 5 using 3 × 8 TB HDD • RAID verification • Storage health check 4. Microsoft Windows Server Installation • Install Windows Server 2022/2025 • Install latest drivers • Configure server hostname • Configure Windows Updates • Activate Windows License (Customer supplied) 5. Active Directory Parallel Deployment The existing Active Directory server will remain operational throughout the project. The vendor shall: • Join the new server to the existing domain • Install Active Directory Domain Services (AD DS) • Promote the server as an Additional Domain Controller (ADC) • Configure DNS replication • Configure Global Catalog • Verify SYSVOL and Active Directory replication • Perform replication health checks • Verify authentication and DNS resolution • Ensure no interruption to production services 6. File Server Configuration • Create shared folders • Configure NTFS permissions • Configure departmental shares • Configure file quotas (if required) • Configure Shadow Copies 7. Backup Configuration • Configure dedicated backup storage 4x8 • Install backup software • Configure backup jobs • Daily Incremental Backup • Weekly Full Backup • Monthly Archive Backup • Backup monitoring • Backup Restore Testing 8. Security Configuration • Configure Windows Firewall • Configure Microsoft Defender • Configure password and account lockout policies • Configure audit policies • Configure Windows Time Service 9. Network Configuration • Configure static IP • Configure DNS • Verify Active Directory replication over the network • Test client authentication and name resolution 10. Server Optimization • Performance Optimization • Storage Optimization • Event Log Configuration • Health Monitoring • Performance Monitoring 11. Testing & Commissioning • RAID verification • Storage performance testing • Active Directory replication testing • DNS functionality testing • File share access testing • Backup and restore testing • User authentication testing • Server health and event log review ______________ Deliverables Required: • Dell PowerEdge R760xs is preferred. • Windows Server installed and activated. • Active Directory configured. • File Server configured. • 3 × 8 TB RAID 5 Data Storage configured. • 3 × 8 TB RAID 5 Backup Storage configured. • Backup jobs configured and tested. • Documentation. • Administrator handover. MAIS JOUBAN Contracts & Commercial Engineer Leos International Holding Group Phone: +971 (0) 48759555 Tel (UAE): +971 (0) 4 875 9555 Mobile: +971 50 157 4609 Email: mais.jouban@leosuk.com Web: www.leosdevelopments.com Project ADQ/2026/001557 Antonio Active
Firdous Kunju MAAREFAH MANAGEMENT FZCO https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac 25-Aug-26 09:00:00 - 12:00:00 Professional Service Charges for Firewall Installation • Physical installation of firewall • Assign Management IP • Network connectivity. • Interface creation with VLANs if required. • Policy creation with Web and Application filter as required. • User / Device based policy for internet access. • Security policy configuration as per best practices Create Web and Application filter as required. User / Device based policy for internet access. • Testing and Troubleshooting • Handover and basic training to customer NAS Storage installation and Configuration • Data Migration from Existing server to new NAS • Physical installation of Storage • Installation of HDD in storage • RAID configuration as required. • User Creation with access permission • Shared folder configuration • Provide access to users. • Handover Cabling • One point cable pulling Physical Installation of Rack and Server. AP Configuration Ruijie Access Points configuration and Centralized Management without Cabling Cabling Includes of One AP for 508 Office. 6 Months Onsite Support which includes 6 Onsite Visits and 20 Remote Tickets Excluded: Civil work, Electrical work Note: 1. Static Public IP address, PPPoE credentials, or DMZ connectivity must be available and provided by the ISP/customer for VPN configuration. 2. Please make sure the part number of the Drive should be 8TB WD80EFPX WD RED PLUS 256MB SATA. 3. We can use the Hard Drive in the NAS, but it should be in working condition 4. SSD can be allocated to the Live NAS 5. QNAP TS-464 supports Linux platforms. It provides NFS, SMB/CIFS, SSH, and FTP/SFTP for Linux clients, and also supports Linux virtual machines via Virtualization Station and Linux containers through Container Station. 6. Once Firewall is installed its recommended to use the Access Points instead of Router. It will provide better Wi-Fi coverage and management. 7. For Live Pool we are providing 8TB X 4 HDD to make 16TB usable after RAID. 8. Email OTP for FortiGate users: We will verify the email OTP configuration requirements with the FortiGate support team and confirm the recommended approach. 9. 508 Floor Access Point Recommendation: For the 508 Floor, we recommend using a Ruijie Access Point instead of a router. After the firewall implementation, using a router is not recommended. An access point will provide better Wi-Fi coverage, centralized management, and improved network performance. End User: Maarefah Management Contact Person : Shane Contact Number: +971 52 149 8301 Address: Office 508 Mazaya Business Avenue Tower AA1 JLT Dubai Location: https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac Project BCQ/2026/004333 Antonio Active
Firdous Kunju On Tracking FZCO Office D-209, Dubai Silicon Oasis Head Quarters, NA, Nadd Hessa, Dubai, Dubai, United Arab Emirates, 341159, 24-Aug-26 09:00:00 - 12:00:00 Installation & Basic Configuration – Physical installation, initial setup, WAN/LAN configuration, basic firewall policies and network connectivity testing VPN Configuration – Configuration of secure remote-access VPN on the FortiGate firewall for authorized users to access the office network remotely RDP User Configuration – Configuration of authorized users for secure Remote Desktop access to the Windows Server hosting the Sage 300 ERP application. End User: On Tracking FZCO Email: Mindaugas.v@ontracking.ae Contact Person: Faisal Rehman Contact Number: 971 58 890 8515 Address: Office D-209, Dubai Silicon Oasis Head Quarters, NA, Nadd Hessa, Dubai, Dubai, United Arab Emirates, 341159, Project BCQ/2026/004875 Antonio Active
Firdous Kunju Asma Hotel Al Barsha https://maps.app.goo.gl/8wggQs1qjJg32CHL8 24-Aug-26 14:00:00 - 18:00:00 SOW: Server HDD and RAID controller replacement. Rijas: +971 52 693 0899 AMC - Antonio Active
Firdous Kunju Mams Trading L.L.C https://maps.app.goo.gl/Aa3x9SosngKanHRY7 22-Aug-26 09:00:00 - 12:00:00 IT service charges for VLAN configuration. +971 50 828 8757 On Call LCSQ/2026/000980 Antonio Active
Firdous Kunju VEEDOL INTERNATIONAL DMCC Unit No. 1501, Indigo Icon, Cluster F, JLT, P.O. Box 117019, Dubai, U.A.E. 21-Aug-26 09:00:00 - 18:00:00 NAS HDD replacement. AMC - Antonio Active
Firdous Kunju Delta Trading Centre LLC https://share.google/eChGUzxTtsj8gMgfF 20-Aug-26 14:00:00 - 18:00:00 HPE 1TB SATA HDD replacement. +971 52 362 6973 On Call BCQ/2026/004946 Antonio Active
Firdous Kunju RADIO HOLLAND MIDDLE EAST LLC https://maps.app.goo.gl/p5A5NPRFVKaLRHwo9 19-Aug-26 09:00:00 - 18:00:00 Scope of Work: • Supply readiness verification and basic installation of Grandstream UCM6302A IP PBX (1 Qty). • Basic configuration of the PBX including: o Creation of extensions for DECT users. o Configuration of up to 2 FXO analog trunk lines. o Call routing, inbound and outbound call setup. o Internal extension dialing and basic call features. • Installation and registration of: o Grandstream DP752 DECT Base Stations – 5 Qty. o Grandstream DECT Handsets (DP722) – 14 Qty. • Pairing and provisioning of all DECT handsets with the corresponding base stations. • Testing of DECT coverage and handset registration. • Integration of the Grandstream PBX with the existing Zenitel Internal Communication System for basic call interoperability, subject to compatibility and availability of integration details. • Remote or onsite support during commissioning. Project BCQ/2026/004909 Antonio Active
Firdous Kunju Inkas Armored Vehicles LLC Al Jabber Building, Dubai Investment Park 2 Dubai UAE 18-Aug-26 14:00:00 - 18:00:00 Professional services for the below scope of work - Installation and configuration of Grandstream UCM6302A IP PBX System as the main IP telephony solution. MTG200-1E1 Digital VoIP Gateway Installation & Configuration Exclusions * Civil works, drilling, wall cutting, and cable pathway modifications. * Supply and installation of network switches, structured cabling, and LAN points unless specifically mentioned. * Telecom service provider charges, PRI/E1 line activation, or SIP trunk charges. * IP phones/handsets unless included in the quotation. * Third-party software licenses and subscriptions. * Integration with third-party applications unless specified. * Any modification in existing network infrastructure. * Annual maintenance contract (AMC) and support services unless separately quoted. Project BCQ/2026/004086 Antonio Active
Firdous Kunju RADIO HOLLAND MIDDLE EAST LLC https://maps.app.goo.gl/p5A5NPRFVKaLRHwo9 17-Aug-26 09:00:00 - 16:00:00 Scope of Work: • Supply readiness verification and basic installation of Grandstream UCM6302A IP PBX (1 Qty). • Basic configuration of the PBX including: o Creation of extensions for DECT users. o Configuration of up to 2 FXO analog trunk lines. o Call routing, inbound and outbound call setup. o Internal extension dialing and basic call features. • Installation and registration of: o Grandstream DP752 DECT Base Stations – 5 Qty. o Grandstream DECT Handsets (DP722) – 14 Qty. • Pairing and provisioning of all DECT handsets with the corresponding base stations. • Testing of DECT coverage and handset registration. • Integration of the Grandstream PBX with the existing Zenitel Internal Communication System for basic call interoperability, subject to compatibility and availability of integration details. • Remote or onsite support during commissioning. Project BCQ/2026/004909 Antonio Active
Firdous Kunju WhiteSea Shipping & Supply (L.L.C) FZC Hamriyah Free Zone, Phase 1 – Sharjah 17-Aug-26 17:00:00 - 20:00:00 FG-50G-BDL-950-12 — FortiGate 50G hardware + 1 Year FortiCare Premium + FortiGuard Unified Threat Protection (UTP) BASIC FIREWALL SETUP AND INSTALLATION CONFIGURATION CHARGES Client Details: Client: WhiteSea Shipping Contact Person: Mr. Ibrahim Mobile: +971 52 904 8703 Location: Hamriyah Free Zone, Phase 1 – Sharjah AMC LCQ/2026/001165 Antonio Active
Firdous Kunju Drees & Sommer Dubai Design District Building 02, Office No. 114 Dubai UAE 13-Aug-26 09:00:00 - 18:00:00 PROFESSIONAL SERVICE Scope of Work: - - Rack dressing and cable management. - Router installation in the rack. - Router port configuration. - Network configuration as per the existing router. - Router testing and handover. - Switch installation in the rack. - Switch VLAN configuration. - Switch port configuration and VLAN mapping. - Switch testing and handover. Carole Kane: +971 52 6784502 Project BCQ/2026/003858 Antonio Active
Firdous Kunju IEX Recreational Playground L.L.C. https://share.google/17zgtGY02CM5tfJXs 12-Aug-26 09:00:00 - 12:00:00 Check and rectify the network issue. Project BCQ/2025/009568 Antonio Active
Firdous Kunju, Jonathan Tolentino MAAREFAH MANAGEMENT FZCO https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac 11-Aug-26 09:00:00 - 18:00:00 Professional Service Charges for Firewall Installation • Physical installation of firewall • Assign Management IP • Network connectivity. • Interface creation with VLANs if required. • Policy creation with Web and Application filter as required. • User / Device based policy for internet access. • Security policy configuration as per best practices Create Web and Application filter as required. User / Device based policy for internet access. • Testing and Troubleshooting • Handover and basic training to customer NAS Storage installation and Configuration • Data Migration from Existing server to new NAS • Physical installation of Storage • Installation of HDD in storage • RAID configuration as required. • User Creation with access permission • Shared folder configuration • Provide access to users. • Handover Cabling • One point cable pulling Physical Installation of Rack and Server. AP Configuration Ruijie Access Points configuration and Centralized Management without Cabling Cabling Includes of One AP for 508 Office. 6 Months Onsite Support which includes 6 Onsite Visits and 20 Remote Tickets Excluded: Civil work, Electrical work Note: 1. Static Public IP address, PPPoE credentials, or DMZ connectivity must be available and provided by the ISP/customer for VPN configuration. 2. Please make sure the part number of the Drive should be 8TB WD80EFPX WD RED PLUS 256MB SATA. 3. We can use the Hard Drive in the NAS, but it should be in working condition 4. SSD can be allocated to the Live NAS 5. QNAP TS-464 supports Linux platforms. It provides NFS, SMB/CIFS, SSH, and FTP/SFTP for Linux clients, and also supports Linux virtual machines via Virtualization Station and Linux containers through Container Station. 6. Once Firewall is installed its recommended to use the Access Points instead of Router. It will provide better Wi-Fi coverage and management. 7. For Live Pool we are providing 8TB X 4 HDD to make 16TB usable after RAID. 8. Email OTP for FortiGate users: We will verify the email OTP configuration requirements with the FortiGate support team and confirm the recommended approach. 9. 508 Floor Access Point Recommendation: For the 508 Floor, we recommend using a Ruijie Access Point instead of a router. After the firewall implementation, using a router is not recommended. An access point will provide better Wi-Fi coverage, centralized management, and improved network performance. End User: Maarefah Management Contact Person : Shane Contact Number: +971 52 149 8301 Address: Office 508 Mazaya Business Avenue Tower AA1 JLT Dubai Location: https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac Project BCQ/2026/004333 Antonio Active
Firdous Kunju MAAREFAH MANAGEMENT FZCO https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac 10-Aug-26 09:00:00 - 18:00:00 Professional Service Charges for Firewall Installation • Physical installation of firewall • Assign Management IP • Network connectivity. • Interface creation with VLANs if required. • Policy creation with Web and Application filter as required. • User / Device based policy for internet access. • Security policy configuration as per best practices Create Web and Application filter as required. User / Device based policy for internet access. • Testing and Troubleshooting • Handover and basic training to customer NAS Storage installation and Configuration • Data Migration from Existing server to new NAS • Physical installation of Storage • Installation of HDD in storage • RAID configuration as required. • User Creation with access permission • Shared folder configuration • Provide access to users. • Handover Cabling • One point cable pulling Physical Installation of Rack and Server. AP Configuration Ruijie Access Points configuration and Centralized Management without Cabling Cabling Includes of One AP for 508 Office. 6 Months Onsite Support which includes 6 Onsite Visits and 20 Remote Tickets Excluded: Civil work, Electrical work Note: 1. Static Public IP address, PPPoE credentials, or DMZ connectivity must be available and provided by the ISP/customer for VPN configuration. 2. Please make sure the part number of the Drive should be 8TB WD80EFPX WD RED PLUS 256MB SATA. 3. We can use the Hard Drive in the NAS, but it should be in working condition 4. SSD can be allocated to the Live NAS 5. QNAP TS-464 supports Linux platforms. It provides NFS, SMB/CIFS, SSH, and FTP/SFTP for Linux clients, and also supports Linux virtual machines via Virtualization Station and Linux containers through Container Station. 6. Once Firewall is installed its recommended to use the Access Points instead of Router. It will provide better Wi-Fi coverage and management. 7. For Live Pool we are providing 8TB X 4 HDD to make 16TB usable after RAID. 8. Email OTP for FortiGate users: We will verify the email OTP configuration requirements with the FortiGate support team and confirm the recommended approach. 9. 508 Floor Access Point Recommendation: For the 508 Floor, we recommend using a Ruijie Access Point instead of a router. After the firewall implementation, using a router is not recommended. An access point will provide better Wi-Fi coverage, centralized management, and improved network performance. End User: Maarefah Management Contact Person : Shane Contact Number: +971 52 149 8301 Address: Office 508 Mazaya Business Avenue Tower AA1 JLT Dubai Location: https://maps.app.goo.gl/Cjnz271NzXsm8iX77?g_st=ac Project BCQ/2026/004333 Antonio Active
Firoz Mandiwala, Jamil Akhtar, Maninder Singh EGYCON CONTRACTING L.L.C MAZAYA BUSINESS CENTRE UNIT 3001 & 3002 09-Sep-26 10:00:00 - 18:00:00 CAMERA AND TELEPHONE CABLING Project, ELV To be collected from office BCQ/2026/005485 Moiz Active
Firoz Mandiwala Helios Perfumes & Cosmetics LLC https://share.google/hZuknB7WMZcGlvBW3 08-Sep-26 09:00:00 - 12:00:00 Check and rectify the Biometric issues. AMC No Material - Antonio Active
Firoz Mandiwala, Imran Ahmed, Maninder Singh RELM INSURANCE OFFICE TOWER LEVEL 16 DIFC 05-Sep-26 10:00:00 - 18:00:00 CONFERENCE SETUP , TV FIXING Project, ELV Delivered - Antonio Active
Firoz Mandiwala, Jaffer Mohamed, Maninder Singh RRS Office 2701, Boulevard Plaza Tower 1, Downtown, Dubai, UAE 26-Aug-26 10:00:00 - 14:00:00 Cable pulling and configuration for CCTV and Phones. Company name: RRS INTERNATIONAL DEVELOPMENT FZ LLC Location: Office 2701, Boulevard Plaza Tower 1, Downtown, Dubai, UAE Contact person: Denver Johnson Contact number: +971 58 823 6810 Project, ELV BCQ/2026/004713 Moiz Active
Firoz Mandiwala, Jaffer Mohamed, Maninder Singh BurjX Mena Limited https://maps.app.goo.gl/7GopWDgq7BzfjXC59?g_st=ac 26-Aug-26 15:00:00 - 18:00:00 Company Name: BurjX Mena Limited POC: Mr. Rajan Jha +971 56 243 3860 Site Google Map Location: Business Bay Office no 2303/2304 https://maps.app.goo.gl/7GopWDgq7BzfjXC59?g_st=ac Scope of Work: Access control Project, ELV BCQ/2026/004978 Moiz Active
Firoz Mandiwala Italian Dairy Products FZC https://share.google/JxfinXdc4ubtrvUw8 17-Aug-26 15:00:00 - 18:00:00 Internet & Printer Issues. Roshini: +971 52 409 7331 AMC - Antonio Active
Firoz Mandiwala, Imran Ahmed, Maninder Singh LA MARIQISE Dubai 15-Aug-26 09:00:00 - 18:00:00 Camera Cabling Project LCQ/2026/001143 Antonio Active
Hussain Bandookwala, Maninder Singh AIRPOWER JABEL ALI 02-Sep-26 10:00:00 - 18:00:00 WIFI CHECKING AND ISSUE RESOLVING Project, ELV Delivered - Moiz Active
Hussain Bandookwala, Imran Ahmed, Rajakumar Selvaraj SHINHAN BANK DIFC 31-Aug-26 09:00:00 - 18:00:00 FINISHING REMAINING WORK Project, ELV Delivered - Moiz Active
Hussain Bandookwala, Maninder Singh, Omprakash Nokhwal BIKANERWALA ALQUOZ / DIP SITE 27-Aug-26 03:00:00 - 18:00:00 CAMERA RECTIFICATION Project, ELV Delivered - Antonio Active
Hussain Bandookwala, Maninder Singh, Omprakash Nokhwal DRIZZ ACAI CAFE LLC DUBAI 467 AL WASL ROAD 27-Aug-26 09:30:00 - 14:00:00 HEIGHT CAMERA CABLING Project, ELV Delivered LCSQ 2026 000703 Antonio Active
Hussain Bandookwala, Omprakash Nokhwal DAR AL ROKHAM JABEL ALI INDUSTRIAL AREA 27-Aug-26 10:00:00 - 18:00:00 CABLING WORK AND TELEPHONE CONFIGURATION Project, ELV Delivered - Moiz Active
Hussain Rangwala, Jamil Akhtar, Shoaib Qureshi ORASCOM HMFZA SHARJAH 02-Sep-26 09:30:00 - 18:00:00 REMAINING WORK Project, ELV Delivered - Moiz Active
Hussain Rangwala, Jamil Akhtar, Shoaib Qureshi ORASCOM HMFZA SHARJAH 02-Sep-26 10:00:00 - 18:00:00 TERMINATION AND ADDITIONAL WORK CHECKING Project, ELV Delivered - Moiz Active
Hussain Rangwala, Jamil Akhtar, Rajakumar Selvaraj, Shoaib Qureshi ORASCOM HMFZA SHARJAH 01-Sep-26 09:30:00 - 18:00:00 CABLING AND TERMINATION WORK Project, ELV Delivered - Moiz Active
Hussain Rangwala, Jamil Akhtar, Shoaib Qureshi ORASCOM HMFZA SHARJAH 31-Aug-26 10:00:00 - 18:00:00 CABLING AND NETWORKING Project, ELV To be collected from office - Moiz Active
Hussain Rangwala, Imran Ahmed, Maninder Singh SHARJAH LADIES CLUB SHARJAH CORNICHE 29-Aug-26 09:30:00 - 18:00:00 CAMERA CABLING Project, ELV To be collected from office BCQ/2026/003238 Moiz Active
Hussain Rangwala, Jamil Akhtar, Shoaib Qureshi ORASCOM HMFZA SHARJAH 29-Aug-26 10:00:00 - 18:00:00 CABLING FOR CAT6 AND TERMINATION Project, ELV To be collected from office - Moiz Active
Hussain Rangwala, Jamil Akhtar, Shoaib Qureshi Orascom Sharjah_Hamriyah 26-Aug-26 09:00:00 - 18:00:00 Data points cabling Project, ELV BCQ/2026/009292 Moiz Active
Hussain Rangwala Ras Al Khaimah Tourism Development Authority RAK Bank Head Office Building 7th Floor Al Ghafat Road, Al Riffa RAS AL KHAIMAH UAE 20-Aug-26 14:00:00 - 18:00:00 UPS Preventive Maintenance AMC - Antonio Active
Huzaifa Raja, Jamil Akhtar, Rajakumar Selvaraj, Shoaib Qureshi ORASCOM HMFZA SHARJAH 05-Sep-26 09:30:00 - 18:00:00 new cabling and termination Project, ELV To be collected from office BCQ 2026 008863 Antonio Active
Huzaifa Raja, Jamil Akhtar, Maninder Singh, Rajakumar Selvaraj, Shoaib Qureshi ORASCOM HMFZA SHARJAH 03-Sep-26 10:00:00 - 18:00:00 additonal cabling and existing project going on Project, ELV To be collected from office - Moiz Active
Huzaifa Raja, Jaffer Mohamed SHABBIR SIR RAJA VILLA NOVA DUBAI 29-Aug-26 09:30:00 - 13:00:00 WIFI ISSUE NEED TO RECTIFY Project, ELV No Material - Moiz Active
Imran Ahmed, Shoaib Qureshi MUTEENA BUILDING WORKS NEAR SALAHUDDIN METRO 602 ROOM NUMBER 09-Sep-26 09:20:00 - 18:00:00 CABLING WORK RAJVEER SALES PERSON Project, ELV Delivered - Moiz Active
Imran Ahmed, Imran Khan AMS JABEL ALI 03-Sep-26 08:00:00 - 18:00:00 SIRA INSPECTION AND AMC VISIT FOR SIRA Project, ELV No Material - Moiz Active
Imran Khan, Shoaib Qureshi SILK RESTAURENT DUBAI 27-Aug-26 12:00:00 - 16:00:00 SIRA CCTV INSPECTION Project, ELV Delivered - Moiz Active
Jaffer Mohamed Planet Tax Free LLC Office 2/3 Westbury Residence Tower, Business Bay, Dubai 25-Aug-26 09:00:00 - 12:00:00 PDU Instalaltion. Project BCQ/2026/003792 Antonio Active
Jamil Akhtar, Shoaib Qureshi ORASCOM HMFZA SHARJAH 09-Sep-26 10:00:00 - 18:00:00 TERMIATION AND LABELING WORK Project, ELV Delivered - Moiz Active
Jamil Akhtar, Maninder Singh SICURO JLT DMCC 04-Sep-26 09:00:00 - 18:00:00 RACK MANAGMENT Project, ELV No Material - Moiz Active
Jim Gipson Al Sundus: Al Ain https://share.google/kBdf3aJmtcdOjNye9 07-Sep-26 09:00:00 - 12:00:00 Site Visit for Access Control installation. Address: Prestige Tower 17 - 18th Floor - near Capital Mall - Mohamed Bin Zayed City - Abu Dhabi Sarath Das P K Sr. System Administrator | IT | UAE M: +971 544402321 | T: +97126729100 E: sarath.d@sundusglobal.com Site Visit No Material - Antonio Active
Jim Gipson Cure Medical Supplies LLC Store 1, Building 8, Plot 7A1, M41, ICAD Musaffah, Abu Dhabi, UAE 04-Sep-26 14:00:00 - 18:00:00 Check and rectify the system issues. Marvin : +971 50 146 3823 AMC No Material - Antonio Active
Jim Gipson Cloud Spaces - Galleria Mall https://share.google/3EWYgLjqGe9sTdi8g 03-Sep-26 09:00:00 - 11:00:00 Weekly Project Meeting. Site Visit No Material - Antonio Active
Jim Gipson Carré d' Art 2nd Floor, Office 202 Omnia Tower, Al Bahar Street Al Markaziyah West P.O Box 61370 Abu Dhabi United Arab Emirates 03-Sep-26 14:00:00 - 18:00:00 Check and rectify the internet connectivity issues. AMC No Material - Antonio Active
Jim Gipson Cascade Engineering & Contracting LLC https://share.google/cRt59VmgNinEOJ55t 03-Sep-26 14:00:00 - 18:00:00 Check and rectify the NAS drive connectivity issues. AMC No Material - Antonio Active
Jim Gipson Sahara Abu Dhabi Real Estate Management Electra Street - Al Danah - Zone 1 - Abu Dhabi 02-Sep-26 09:00:00 - 18:00:00 Check and rectify the Phone issues for the users. AMC No Material - Antonio Active
Jim Gipson, Sachin Mohandas NAMCO STEEL https://maps.app.goo.gl/fxKzGbdQFRy5LESX6 25-Aug-26 09:00:00 - 18:00:00 Server & NAS installation and configuration. Backup and Antivirus installation and configuration. Client Name: Ms. Furuzan Contact Number: +971 55 411 9776 Project BCQ/2026/004997 Antonio Active
Jim Gipson Tawazun Industrial Park L.L.C. https://maps.app.goo.gl/8G7mF9eRYDppec937 24-Aug-26 11:00:00 - 18:00:00 Installation & Configuration of 86" Interactive E-Board Android with Built-in Camera. Maureen Maurera مورين موريرا Sr. Officer, Procurement Management ضابط أول ، إدارة المشتريات Procurement and Contracts المشتريات والعقود +971 2 5069723 www.tip.ae mmaurera@tip.ae Al Ajban, Abu Dhabi Project ADQ/2026/001565 Antonio Active
Jim Gipson, Sachin Mohandas Jindal Saw Gulf LLC https://maps.app.goo.gl/4GwqynvHv2N8SsyM7 P 12 villa no 22-Aug-26 09:00:00 - 12:00:00 Access Point Installation & Configuration. Project ADQ/2026/001474 Antonio Active
Jim Gipson Crystal Offshore Middle East Al Momourah Khalifa Port Plot P2A - Sector Khai 2 - Abu Dhabi 14-Aug-26 09:00:00 - 11:00:00 Check and rectify the internet issues AMC - Antonio Active
Joe Myo Emirates Kitchen Equipment Co. L.L.C Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai 09-Sep-26 09:00:00 - 14:00:00 Setup the systems for the users and internet connectivity issues. AMC No Material - Antonio Active
Joe Myo VID ONE OILFIELD EQUIPMENT MANUFACTURING L.L.C https://share.google/xDRMuboxiTH8aAqLE 08-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance. Dubai Investment Park 2, Dubai, United Arab Emirates Tel: +971 4 227 6899,Mob +971547058288| Mail: admin@vidoneoem.com | Web: www.vidoneoem.com AMC No Material - Antonio Active
Joe Myo Berkshire Hathaway Specialty Insurance Company Level 21, Offices 2103, 2104 & 2105, Index Tower, DIFC, PO Box 506861, Dubai, UAE 07-Sep-26 09:00:00 - 12:00:00 Audit for the laptops. AMC No Material - Antonio Active
Joe Myo Beyond Limits Beyond Limits Business Center https://share.google/Vb96kmm7ezB035dgC 07-Sep-26 14:00:00 - 18:00:00 Preventive Maintenance & WiFi issues. Address: 19th Floor, Exchange Tower - Business Bay - Dubai AMC No Material - Antonio Active
Joe Myo R A A L C GOVERNMENT TRANSACTIONS SERVICES L.L.C EXM-01A Bin Sougat Centre, Airport Rd Al Rashidiya, Dubai Dubai UAE 04-Sep-26 09:00:00 - 11:00:00 Printer Cartridge installation AMC Delivered - Antonio Active
Joe Myo Emirates Kitchen Equipment Co. L.L.C Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai 04-Sep-26 12:00:00 - 18:00:00 Setup the systems for the users x 2. AMC No Material - Antonio Active
Joe Myo, Miles Yvo Gulf Extrusions LLC - Abu Dhabi Alia Tower, Khalifa Bin Zayed The First - 535 street - Al Danah - Abu Dhabi 03-Sep-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project No Material BCQ/2025/009609 Antonio Active
Joe Myo International House Real Estate Avenues - Office 8 - Block C 9th St - Nadd Al Hamar – Dubai 02-Sep-26 09:00:00 - 12:00:00 System setup for the user. Sanooj: +971 50 687 7726 On Call To be collected from office BCQ/2026/005240 Antonio Active
Joe Myo Luxottica Middle East FZE Burjuman 02-Sep-26 14:00:00 - 18:00:00 Phone Installation and META glasses configuration. YATEEM - BURJUMAN CENTER BURJUMAN CENTER OCCHIALI - BURJUMAN CENTER BURJUMAN CENTER DOC M BURJUMAN MALL DXB BURJUMAN CENTER RIVOLI EZ BURJUMAN BURJUMAN CENTER Project To be collected from office LME-Liberty- Services Agreement Antonio Active
Joe Myo Chartered Institute of Procurement and Supply 25th Floor Burj Al Salam Bldg., Sheikh Zayed Road, PO 74327 Dubai, United Arab Emirates 01-Sep-26 09:00:00 - 12:00:00 System setup for the user. AMC - Antonio Active
Joe Myo, John Louis Luxottica Middle East FZE https://maps.google.com/?q=25.262669,55.371788 31-Aug-26 12:30:00 - 13:30:00 Training for Phone Installation and META glasses configuration. Luxottica Middle East FZE, 801, Building 4WA, DAFZA, Dubai Mr. Sri : +971 55 367 2483 Project No Material LME-Liberty- Services Agreement Antonio Active
Joe Myo, Rajveer Raiya GIFTCO INTERNATIONAL LLC https://share.google/HPo2H7OEhMyLX4IKP 31-Aug-26 14:00:00 - 18:00:00 Check and rectify the WiFi issues. AMC No Material - Antonio Active
Joe Myo Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 27-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 26-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo, John Louis Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 25-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo, Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 24-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo, Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 21-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) AMC - Antonio Active
Joe Myo, Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 20-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 19-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 18-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 17-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Joe Myo, Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 14-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
John Louis, Jonathan Tolentino Golden Falcon General Trading LLC Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE 09-Sep-26 09:00:00 - 12:00:00 Check and rectify the network issues. AMC No Material - Antonio Active
John Louis TARTAN GLOBAL General Trading L.L.C. 3306, Concord Tower Media City Dubai 416130 United Arab Emirates 08-Sep-26 09:00:00 - 18:00:00 Complete IT Audit. AMC No Material - Antonio Active
John Louis NAOS https://share.google/u9XbPgfdembNm3tHU 07-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance AMC No Material - Antonio Active
John Louis The Philippine School The Philippine School - Muhaisanah Second - Muhaisanah 2 - Dubai 03-Sep-26 09:00:00 - 12:00:00 VLAN Configuration. AMC No Material - Antonio Active
John Louis TME LEGAL CONSULTANTS FZ LLC Almas Tower, Jumeirah Lakes Towers (JLT), Dubai 03-Sep-26 14:00:00 - 18:00:00 Check and rectify the system issues. Check and rectify the printer issues. AMC No Material - Antonio Active
John Louis BWA Middle East https://share.google/bVU9w6bLIURIGmPeF 02-Sep-26 09:00:00 - 18:00:00 Check the issues with the NAS drive and Backup (Coordinate with Bajinder). Office 210, Apex Atrium - Al Hebiah First - Dubai Motor City - Dubai AMC No Material - Antonio Active
John Louis Broadway Interiors LLC Grosvenor Business Tower, 1512 - Barsha Heights - Dubai 01-Sep-26 09:00:00 - 12:00:00 Check the system issues for the users. AMC - Antonio Active
John Louis TARTAN GLOBAL General Trading L.L.C. 3306, Concord Tower Media City Dubai 416130 United Arab Emirates 01-Sep-26 14:00:00 - 18:00:00 IT Audit. AMC No Material - Antonio Active
John Louis PETRONAS MANAGEMENT SERVICES FZCO (DMCC-197475) Unit 401, Jumeirah Business Centre 2, Cluster V Jumeirah Lakes Towers, Dubai, United Arab Emirates 31-Aug-26 09:00:00 - 11:00:00 Battery replacement: Model : HP EliteBook 840 G10 Product ID : 81A19EA#BH5 On Call To be collected from office BCQ/2026/005169 Antonio Active
John Louis Golden Falcon General Trading LLC Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE 27-Aug-26 14:00:00 - 18:00:00 Check and rectify the system issues. AMC - Antonio Active
John Louis BWA Middle East https://share.google/bVU9w6bLIURIGmPeF 26-Aug-26 09:00:00 - 18:00:00 Check the issues with the NAS drive and Backup (Coordinate with Bajinder). Office 210, Apex Atrium - Al Hebiah First - Dubai Motor City - Dubai AMC - Antonio Active
John Louis NAOS https://share.google/u9XbPgfdembNm3tHU 24-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
John Louis PWS Gulf Insurance Brokers LLC Office Nos. MR4 & MR5 GR5 Wafi Residence Building Umm Hurrair 2 UAE 21-Aug-26 09:00:00 - 18:00:00 - IT Support. - Rename the system hostnames. AMC - Antonio Active
John Louis Fifth Dimension Elementary School Nad Al Sheba - Nad Al Sheba 4 - Dubai 20-Aug-26 09:00:00 - 18:00:00 IT Audit and Handover collection. Fifth Dimension Elementary School Nad Al Sheba - Nad Al Sheba 4 - Dubai http://www.fifthdimension.ae/ 045918182 AMC - Antonio Active
John Louis The Philippine School The Philippine School - Muhaisanah Second - Muhaisanah 2 - Dubai 19-Aug-26 09:00:00 - 12:00:00 Preventive Maintenance. Name: Mr. Jed Contact: 0547384297 AMC - Antonio Active
John Louis AL SHIBA PROPERTIES https://share.google/rwG6bhSWAGFFTfYV9 19-Aug-26 14:00:00 - 18:00:00 Preventive Maintenance. Contact Person: Ms. Sarah Number: 050 635 7224 / 04 333 3335 Address: Office No: 07 AL MANAMA STREET - Bu Kadra - Ras Al Khor - Dubai https://share.google/rwG6bhSWAGFFTfYV9 AMC - Antonio Active
John Louis Fajr Capital Limited Level 3, Gate Village 5, DIFC - Dubai 18-Aug-26 09:00:00 - 12:00:00 AMC Handover. AMC - Antonio Active
John Louis NAOS https://share.google/u9XbPgfdembNm3tHU 17-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
John Louis PWS GULF INSURANCE BROKERS LLC Office Nos. MR4 & MR5 GR5 Wafi Residence Building Umm Hurrair 2 PO Box 22135, Dubai, United Arab Emirates 14-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance & IT Assistance. Office Nos. MR4 & MR5 GR5 Wafi Residence Building Umm Hurrair 2 PO Box 22135, Dubai, United Arab Emirates Phone: +9714 3552434 AMC - Antonio Active
John Louis Globe Constructors Ltd L.L.C. https://share.google/vVAkMRHHFn4kZQfNB 13-Aug-26 09:00:00 - 12:00:00 Email Configuration for the user. 501,502 Mina Offices Building 18 Al Marija Street, Al Marija, Sharjah, U.A.E. Phone: 06 563 7962 AMC - Antonio Active
John Louis Rokadia Brothers LLC https://maps.app.goo.gl/hhVpv9zyi3Mu385bA 12-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
John Louis Fajr Capital Limited Level 3, Gate Village 5, DIFC - Dubai 11-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
John Louis NAOS https://share.google/u9XbPgfdembNm3tHU 10-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
Jonathan Tolentino Mirdif Center for Physiotherapy & Rehabilitation https://share.google/lI7h8HoEkKr7YdX1W 08-Sep-26 09:00:00 - 12:00:00 Printer Cartridge replacement. AMC To be collected from office - Antonio Active
Jonathan Tolentino Royal Garden Center https://share.google/3anS7jcpAaagxgIPh 08-Sep-26 14:00:00 - 18:00:00 Check and rectify the Biometrics issues. Contact Person: Feviyan Number: 04 340 0648 / 055 142 7915 Address: Dubai Plant Souq - Al - Warsan 3 - Dubai https://share.google/3anS7jcpAaagxgIPh AMC - Antonio Active
Jonathan Tolentino Trendz Packaging Solutions FZE Saif Zone Sharjah, https://share.google/NTpCva9ltF8cmKazO 07-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance AMC No Material - Antonio Active
Jonathan Tolentino Mirdif Center for Physiotherapy & Rehabilitation https://share.google/lI7h8HoEkKr7YdX1W 05-Sep-26 08:00:00 - 12:00:00 Check and rectify the network connectivity issues. AMC No Material - Antonio Active
Jonathan Tolentino C.H. Robinson Freight Services Gulf LLC Office # 101, Building # A4 DWC Business Park Dubai South Dubai UAE 04-Sep-26 09:00:00 - 18:00:00 Check and rectify the WiFi issues. Check and rectify the Video Conference issues. Project No Material BCQ/2026/003657 Antonio Active
Jonathan Tolentino MyPediaClinic https://share.google/NPb7dOInXN8iBCjm1 03-Sep-26 09:00:00 - 12:00:00 Check and rectify the internet issues. AMC No Material - Antonio Active
Jonathan Tolentino Blue Ruby FZCO One Deira Mall, Office 411, Deira City Dubai United Arab Emirates 03-Sep-26 14:00:00 - 18:00:00 IT Audit for AMC. Address- One Deira Mall, Office 411, Deira City Dubai United Arab Emirates Contact Person: Lobe Benito Contact No: +971 58560 8571 AMC No Material - Antonio Active
Jonathan Tolentino, Rajakumar Selvaraj Quirónsalud Specialty Hospital https://share.google/VlfvVmuPUhvNlwsk1 02-Sep-26 09:00:00 - 14:00:00 Check and rectify the network connectivity issues. AMC No Material - Antonio Active
Jonathan Tolentino Al Tayer Stocks LLC 42nd Floor, Ubora Tower, Business Bay 02-Sep-26 14:00:00 - 18:00:00 Collect the materials from the office. Matrix Device configuration. Regards Mohd Tariq Al Tayer Stocks LLC T: +971 4 503 4834 / +971 56 206 2311 Project To be collected from office BCQ/2026/001633 Antonio Active
Jonathan Tolentino INVESTSURE Emaar Square Building 3, 4th Floor, Office 423, Dubai, UAE 01-Sep-26 09:00:00 - 12:00:00 Site Visit for AMC. +971 54 377 1084 Emaar Square Building 3, 4th Floor, Office 423, Dubai, UAE Site Visit No Material - Antonio Active
Jonathan Tolentino Emirates Kitchen Equipment Co. L.L.C Al Fajer Complex, Office Entrance B - Office 101, Level 1 - Umm Hurair Rd - Oud Metha - Dubai 01-Sep-26 14:00:00 - 18:00:00 Check and rectify the internet issues. AMC No Material - Antonio Active
Jonathan Tolentino Investra Investments LLC https://maps.app.goo.gl/iyPbvsqadzxfS5kB9 31-Aug-26 09:00:00 - 12:00:00 Check and rectify the internet issues. Address: Office 124, The Iridium Building Umm Suqeim Street, Al Barsha 1 P.O. Box: 112438 Dubai, United Arab Emirates Contact Person: Ms. Vivet Colaco Contact no: 04-4380211 AMC No Material - Antonio Active
Jonathan Tolentino Craneburg Global FZCO JLT, Cluster I, Platinum Tower, Office 505 31-Aug-26 14:00:00 - 18:00:00 Check and rectify the internet issues. For internet : (SIID):971888889201053415 Password: 971888889201053415 For CPE : Username – Admin Password – Du#CPE_soc URL – https://192.168.70.1 Customer: Craneburg Global FZCO Location: JLT, Cluster I, Platinum Tower, Office 505 Contact Person: Ms. Nadine Slaiby Contact number: +971 52 946 5077 Project No Material BCQ/2026/002999 Antonio Active
Jonathan Tolentino Mirdif Center for Physiotherapy & Rehabilitation https://share.google/lI7h8HoEkKr7YdX1W 27-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. AMC - Antonio Active
Jonathan Tolentino FUELING MARITIME MIDDLE EAST FZCO Glander Bunkering 26-Aug-26 09:00:00 - 12:00:00 - Biometric user enrollment. Project BCQ/2026/003042 Antonio Active
Jonathan Tolentino, Omprakash Nokhwal FUELING MARITIME MIDDLE EAST FZCO Unit No: 2908 LIWA HEIGHTS 1 Plot No: JLT-PH2-W3A Jumeirah Lakes Towers Dubai 25-Aug-26 09:00:00 - 18:00:00 Collect the materials from the office. - HDMI splitter Installation. - Biometric configuration. Project BCQ/2026/003903 Antonio Active
Jonathan Tolentino Mams Trading L.L.C https://maps.app.goo.gl/Aa3x9SosngKanHRY7 22-Aug-26 09:00:00 - 18:00:00 IT service charges for VLAN configuration. +971 50 828 8757 On Call LCSQ/2026/000980 Antonio Active
Jonathan Tolentino SAINT-GOBAIN EMME https://maps.app.goo.gl/F3t1pth8b8U3w2WR8 21-Aug-26 11:00:00 - 12:00:00 After Confirmation. Mount the Matrix device. Office 301, City Tower 2 12276 • UAE Ashoka Koragappa IT Service Delivery Analyst United Arab Emirates Mobile: +971 564 049 561 Tel.: +971(0) 44 037 515 Ashoka.Koragappa@Fosroc.com Site Visit - Antonio Active
Jonathan Tolentino VEEDOL INTERNATIONAL DMCC Unit No. 1501, Indigo Icon, Cluster F, JLT, P.O. Box 117019, Dubai, U.A.E. 21-Aug-26 14:00:00 - 18:00:00 Data cabling for one phone. AMC - Antonio Active
Jonathan Tolentino TME LEGAL CONSULTANTS FZ LLC Almas Tower, Jumeirah Lakes Towers (JLT), Dubai 20-Aug-26 14:00:00 - 18:00:00 Video Conference Setup. Project BCQ/2026/002939 Antonio Active
Jonathan Tolentino, Shoaib Qureshi Planet Tax Free LLC Office 2/3 Westbury Residence Tower, Business Bay, Dubai 19-Aug-26 09:00:00 - 12:00:00 - Physical installation of Rack. - Mounting of UPS. Project BCQ/2026/003792 Antonio Active
Jonathan Tolentino DOMUS COMMUNICATIONS CO LLC https://maps.app.goo.gl/XJytuTjwGatvPT9p8 18-Aug-26 09:00:00 - 18:00:00 COLLECT THE MATERIALS FROM THE OFFICE. PROFESSIONAL SERVICE: - installation services for switch mounting, physical installation, configuration, setup, testing, and commissioning. Location: https://maps.app.goo.gl/XJytuTjwGatvPT9p8 Al Mamzar, Villa 507, near century mall Contact person: Thomas Contact number: +971 50 243 4385 Project BCQ/2026/004752 Antonio Active
Jonathan Tolentino TME LEGAL CONSULTANTS FZ LLC Almas Tower, Jumeirah Lakes Towers (JLT), Dubai 17-Aug-26 09:00:00 - 12:00:00 Collect the cable from the office. - System Setup for the users. - VC installation. - WiFi connectivity testing. Project BCQ/2026/002939 Antonio Active
Jonathan Tolentino Mirdif Center for Physiotherapy & Rehabilitation https://share.google/lI7h8HoEkKr7YdX1W 14-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance AMC - Antonio Active
Jonathan Tolentino Tex and Turnkey Interiors LLC https://share.google/OA7ccsaTCT43kcomY 13-Aug-26 09:00:00 - 12:00:00 Site Survey for Office Shifting. Mohammad Zartab Alam Tex and Turnkey Interiors LLC Warehouse 1, 2 & 3, DIP 2 Near Pepsi Roundabout, Dubai, U.A.E Tel: 04 3213265 Mob: +971 504809530 Site Visit - Antonio Active
Jonathan Tolentino International House Real Estate Avenues - Office 8 - Block C 9th St - Nadd Al Hamar – Dubai 12-Aug-26 09:00:00 - 12:00:00 Scope of Work: Troubleshoot and check the client's telephone issue. Verify and diagnose network connectivity and telephone port-related issues. As per the client's findings, the issue appears to be related to the port configuration/connection. The engineer will inspect and rectify the issue wherever possible. Test the telephone functionality after troubleshooting and provide recommendations. Note: Any hardware, spare parts, accessories, or replacement components required will be quoted and charged separately. Client name: International House Real Estate Location: Address: Avenues - Office 8 - Block C 9th St - Nadd Al Hamar – Dubai Contact number: +971 56 851 7589 On Call BCQ/2026/004669 Antonio Active
Jonathan Tolentino Millennium Energy FZE https://maps.app.goo.gl/4acgaEZfozVREomt5?g_st=awb 12-Aug-26 14:00:00 - 18:00:00 Check and rectify the Biometric Issues. Mr. Irfan: +971 50 432 6341 AMC - Antonio Active
Jonathan Tolentino ClearGrid FZ-LLC https://maps.app.goo.gl/fcVEQy5cFY1Z1zFM6 11-Aug-26 14:00:00 - 18:00:00 • Survey the new office floor. • Assess the required number and locations of LAN points. • Assess the required number and optimal placement of wireless access points. • Provide recommendations for network infrastructure installation. • Company: ClearGrid FZ-LLC • Contact Persons: Ms. Avah / Mr. Godwin • Contact Numbers: 056 672 5384 / 052 698 5355 • Office Address: Office 124, Publishing Pavilion, Production City • Location: https://maps.app.goo.gl/fcVEQy5cFY1Z1zFM6 Site Visit - Antonio Active
Miles Yvo Steki Restaurant Courtyard, first level, Al Marina - Abu Dhabi - United Arab 09-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance AMC No Material - Antonio Active
Miles Yvo CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION Wafra Square Offices, 5th floor Al Reem Mall Inersection,Najmat Abu Dhabi,Al Reem Island Abu Dhabi 08-Sep-26 09:00:00 - 12:00:00 Check and rectify the monitor issues. +971 (0)56-688829 +971 (0) 2-201-3401 On Call No Material BCQ/2026/004038 Antonio Active
Miles Yvo PETRONAS MANAGEMENT SERVICES FZCO (DMCC-197475) Unit 401, Jumeirah Business Centre 2, Cluster V Jumeirah Lakes Towers, Dubai, United Arab Emirates 07-Sep-26 09:00:00 - 12:00:00 Battery replacement: Model : HP EliteBook 840 G10 Product ID : 81A19EA#BH5 On Call To be collected from office BCQ/2026/005169 Antonio Active
Miles Yvo RAD STAR TRADING L.L.C 2404- Single business tower business bay- Dubai Dubai United Arab Emirates 07-Sep-26 12:00:00 - 18:00:00 Acronis Endpoint Security installation. Project No Material LCQ/2026/00AS602 Antonio Active
Miles Yvo Vetcare Veterinary Medical Centre https://bit.ly/2W4WvKh 05-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance. Reception:044309797 Emergencies: 0505501698 Diamond Business Center 1, Block B Arjan, Dubai, UAE. www.vetcaredubai.com Location: https://bit.ly/2W4WvKh AMC No Material - Antonio Active
Miles Yvo, Sachin Mohandas Gulf Extrusions LLC - Abu Dhabi Alia Tower, Khalifa Bin Zayed The First - 535 street - Al Danah - Abu Dhabi 04-Sep-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project No Material BCQ/2025/009609 Antonio Active
Miles Yvo NAMCO STEEL https://maps.app.goo.gl/fxKzGbdQFRy5LESX6 02-Sep-26 09:00:00 - 12:00:00 NAS installation and configuration. Backup and Antivirus installation and configuration. Client Name: Ms. Furuzan Contact Number: +971 55 411 9776 Project To be collected from office BCQ/2026/004997 Antonio Active
Miles Yvo Everlast Pharmacy https://maps.app.goo.gl/suq1FRChwNZk3Efo7 02-Sep-26 12:00:00 - 18:00:00 MCC CCTV Preventive Maintenance AMC - Antonio Active
Miles Yvo Amplex Emirates Company L.L.C Al Manhal - W15 02 - Abu Dhabi 01-Sep-26 14:00:00 - 18:00:00 Unitrends Installation and Configuration along with vendor Tessy-Sariya IT Project No Material ADQ/2026/001123 Antonio Active
Miles Yvo Little Founders Nursery https://share.google/LUi42tAejZqsrUIBy 31-Aug-26 09:00:00 - 10:00:00 Check the NVR connectivity issues. AMC No Material - Antonio Active
Miles Yvo, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 31-Aug-26 09:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project No Material BCQ/2026/002063 Antonio Active
Miles Yvo, Rajveer Raiya, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 30-Aug-26 08:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project No Material BCQ/2026/002063 Antonio Active
Miles Yvo, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 29-Aug-26 09:00:00 - 21:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project No Material BCQ/2026/002063 Antonio Active
Miles Yvo, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 28-Aug-26 08:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project No Material BCQ/2026/002063 Antonio Active
Miles Yvo, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 27-Aug-26 09:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project BCQ/2026/002063 Antonio Active
Miles Yvo ISA Bullion https://maps.app.goo.gl/2dRLJcMXuhka6BDJ9 26-Aug-26 09:00:00 - 12:00:00 Printer Configuration. ISA Commodities, Suite 39B Almas Tower , JLT Cluster D - Near metro station is DMCC https://maps.app.goo.gl/2dRLJcMXuhka6BDJ9 contact person – Michelle , No - +971 52 622 9709 Company name - ISA Bullion AMC - Antonio Active
Miles Yvo Cure Medical Supplies LLC Store 1, Building 8, Plot 7A1, M41, ICAD Musaffah, Abu Dhabi, UAE 25-Aug-26 09:00:00 - 12:00:00 Check and rectify the system issues. Marvin : +971 50 146 3823 AMC - Antonio Active
Miles Yvo, Rahul Saji Amplex Emirates Company L.L.C. Al Manhal - W15 02 - Abu Dhabi 25-Aug-26 09:00:00 - 18:00:00 Unitrends Installation and Configuration along with vendor Tessy-Sariya IT Project ADQ/2026/001123 Antonio Active
Miles Yvo Shield AI Abu Dhabi Global Market Street – First & AI Maryah St, AI Maryah Island, Abu Dhabi, Abu Dhabi Emirate, UAE 24-Aug-26 09:00:00 - 12:00:00 System camera and Audio connectivity. AMC - Antonio Active
Miles Yvo Kinetic7 Unit 1, Floor 19 Al Khatem Tower, ADGM Square, Al Maryah Island, Abu Dhabi, UAE 24-Aug-26 14:00:00 - 18:00:00 Check the system issues for the users. AMC - Antonio Active
Miles Yvo Kinetic7 Unit 1, Floor 19 Al Khatem Tower, ADGM Square, Al Maryah Island, Abu Dhabi, UAE 20-Aug-26 09:00:00 - 10:00:00 Biometric RFID card configuration. AMC - Antonio Active
Miles Yvo PIONEER PRECAST CONCRETE LLC https://maps.app.goo.gl/LirS5aVNyLjkW6GMA?g_st=awb 20-Aug-26 12:00:00 - 18:00:00 IT Audit for AMC. AMC, Site Visit - Antonio Active
Miles Yvo Tex and Turnkey Interiors LLC https://share.google/OA7ccsaTCT43kcomY 19-Aug-26 09:00:00 - 12:00:00 NAS configuration for the users. Site Survey for Office Shifting. Mohammad Zartab Alam Tex and Turnkey Interiors LLC Warehouse 1, 2 & 3, DIP 2 Near Pepsi Roundabout, Dubai, U.A.E Tel: 04 3213265 Mob: +971 504809530 AMC - Antonio Active
Miles Yvo Dome Furniture https://maps.app.goo.gl/b3ZyKKjSX3KiVrb37 19-Aug-26 14:00:00 - 18:00:00 Check the system issue for the user. AMC - Antonio Active
Miles Yvo Kinetic7 Unit 1, Floor 19 Al Khatem Tower, ADGM Square, Al Maryah Island, Abu Dhabi, UAE 18-Aug-26 09:00:00 - 14:00:00 Preventive Maintenance. Biometric RFID card configuration. AMC - Antonio Active
Miles Yvo PACIFIC MIDDLEEAST CHEMICALS BLENDING CO. L.L.C. Plot #115, Street 77, Jebel Ali Industrial Area 1, Dubai, United Arab Emirates 14-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. Nathalie Virgo | Admin Executive PACIFIC MIDDLEEAST CHEMICALS BLENDING CO. L.L.C. Plot #115, Street 77, Jebel Ali Industrial Area 1, Dubai, United Arab Emirates Tel no: +971 4 2727144 Mobile : +971 50 4228271 AMC - Antonio Active
Miles Yvo ISA Bullion https://maps.app.goo.gl/2dRLJcMXuhka6BDJ9 13-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. ISA Commodities, Suite 39B Almas Tower , JLT Cluster D - Near metro station is DMCC https://maps.app.goo.gl/2dRLJcMXuhka6BDJ9 contact person – Michelle , No - +971 52 622 9709 Company name - ISA Bullion AMC - Antonio Active
Miles Yvo Cascade Engineering & Contracting Store 36A - Abu Dhabi 12-Aug-26 09:00:00 - 12:00:00 Preventive Maintenance & Printer Issues. AMC - Antonio Active
Miles Yvo SISL Infotech (UK) LTD Unit 801, South Tower, Emirates Financial Towers, DIFC PO Box 506925 11-Aug-26 09:00:00 - 18:00:00 Level 1 Engineer – On-site deployment support during standard working hours (Replacement of docking stations, webcams, basic cable management, installation support, and end-user assistance). Ms. Olivia - +91 98628 30781 (SISL) Project BCQ/2026/004455 Antonio Active
Miles Yvo SISL Infotech (UK) LTD Unit 801, South Tower, Emirates Financial Towers, DIFC PO Box 506925, Dubai, UAE 10-Aug-26 09:00:00 - 18:00:00 Level 1 Engineer – On-site deployment support during standard working hours (Replacement of docking stations, webcams, basic cable management, installation support, and end-user assistance). Ms. Olivia - +91 98628 30781 (SISL) Project BCQ/2026/004455 Antonio Active
Omprakash Nokhwal FUELING MARITIME MIDDLE EAST FZCO Glander Bunkering 25-Aug-26 14:00:00 - 18:00:00 - Biometric user enrollment. Project BCQ/2026/003042 Antonio Active
Rahul Saji NAMCO STEEL https://maps.app.goo.gl/fxKzGbdQFRy5LESX6 08-Sep-26 09:00:00 - 18:00:00 System setup for the users. Client Name: Ms. Furuzan Contact Number: +971 55 411 9776 Project No Material BCQ/2026/004997 Antonio Active
Rahul Saji Tabarak Investment Capital LTD DIFC, Burj Daman, Office 208 27-Aug-26 09:00:00 - 12:00:00 IT Support. AMC - Antonio Active
Rahul Saji, Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 26-Aug-26 09:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project BCQ/2026/002063 Antonio Active
Rahul Saji Bin Yaber Driving Institute - Jebel Ali Branch Office https://g.co/kgs/iWeFB5m 24-Aug-26 09:00:00 - 12:00:00 Collect the materials from the office. - NVR HDD replacement. MR. SAYYAF - 0561603791 AMC - Antonio Active
Rahul Saji GOODRICH GLOBAL TRADING LLC R.A. MIDDLE EAST Unit 1-13 Plot 598-1149 Warehouse #6, Dubai Investment Park 1 PO BOX 304 Dubai, UAE 24-Aug-26 14:00:00 - 18:00:00 IT Audit for AMC. Contact Person: DJ Thomas Contact #: +971.54.252.3888 Address: Unit 1-13 Plot 598-1149 Warehouse #6, Dubai Investment Park 1 PO BOX 304 Dubai, UAE On Call - Antonio Active
Rahul Saji LLJ Business Center West Wing, Al Jazira Sports Club - Muroor Rd - Al Nahyan - Zone 1 - Abu Dhabi 21-Aug-26 09:00:00 - 18:00:00 IT Audit for AMC. West Wing, Al Jazira Sports Club - Muroor Rd - Al Nahyan - Zone 1 - Abu Dhabi Aslam: 02 4950530, +971 50 592 6528 AMC, Site Visit - Antonio Active
Rahul Saji LLJ Business Center West Wing, Al Jazira Sports Club - Muroor Rd - Al Nahyan - Zone 1 - Abu Dhabi 20-Aug-26 09:00:00 - 18:00:00 IT Audit for AMC. West Wing, Al Jazira Sports Club - Muroor Rd - Al Nahyan - Zone 1 - Abu Dhabi Aslam: 02 4950530, +971 50 592 6528 AMC, Site Visit - Antonio Cancelled
Rahul Saji WRAP IT CARGO PACKAGING LLC 1st floor, Warehouse F03, J1 Warehouses, Jebel Ali Industrial Area 1, 20-Aug-26 09:00:00 - 12:00:00 Check and rectify the internet issues. AMC - Antonio Active
Rahul Saji Linus International FZCO https://share.google/3FqYlWg77dZIiy4Kf 20-Aug-26 14:00:00 - 18:00:00 Check and rectify the NAS connectivity issues. Nisha | +971 52 189 2266 AMC - Antonio Active
Rahul Saji CLYMET LOGISTICS LLC M 21, Al Qusais, Al Qusais Dubai United Arab Emirates 19-Aug-26 21:00:00 - 12:00:00 SSD Installation. AMC - Antonio Active
Rahul Saji SAMSON CONTROLS SOLUTIONS L.L.C, ABU DHABI Alia Tower, Khalifa Bin Zayed The First - 535 street - Al Danah - Abu Dhabi 18-Aug-26 21:00:00 - 12:00:00 Check and rectify the Firewall/Internet issues. AMC - Antonio Active
Rahul Saji Aloteb, Dr Mohammad Abu Dhabi 17-Aug-26 09:00:00 - 12:00:00 Sow: During Normal working hours Gateway configuration • Trunk configuration • Inbound and Outbound configuration • DID and DOD configuration • Configure the inbound and outbound • Permission settings for the extension to use GSM Gateway • Documentation and Handover Rack • Supply and installation of 9U wall-mounted rack. • Installation of rack trays and power distribution unit (PDU). • Mounting of network devices inside the rack. • Power-up testing and verification of connected devices. Excluded: Cabling, Civil work, Electrical work Project BCQ/2026/004223 Antonio Active
Rahul Saji SAMSON CONTROLS SOLUTIONS L.L.C, ABU DHABI Alia Tower, Khalifa Bin Zayed The First - 535 street - Al Danah - Abu Dhabi 15-Aug-26 14:00:00 - 18:00:00 Check and rectify the Firewall/Internet issues. AMC - Antonio Cancelled
Rahul Saji SAMSON CONTROLS FZE https://share.google/jWBvytalFaYEJhWX0 14-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. Address: Blue Shed Area JAFZA Dubai Phone: 04 883 4933 AMC - Antonio Active
Rahul Saji Tex and Turnkey Interiors LLC https://share.google/OA7ccsaTCT43kcomY 13-Aug-26 09:00:00 - 12:00:00 System Setup & IT Support. Mohammad Zartab Alam Tex and Turnkey Interiors LLC Warehouse 1, 2 & 3, DIP 2 Near Pepsi Roundabout, Dubai, U.A.E Tel: 04 3213265 Mob: +971 504809530 AMC - Antonio Active
Rahul Saji Quirónsalud Specialty Hospital https://share.google/VlfvVmuPUhvNlwsk1 13-Aug-26 09:00:00 - 12:00:00 6) Quironsalud Medical Institute LLC SOW:Credence System Check the EID card reader connectivity issues. Address: Villa 1187, 304 Al Wasl Road, Umm Al Sheif District, Dubai, UAE. Tel: +971 4 3422228 AMC - Antonio Cancelled
Rahul Saji DEEP SEA PIPES AND FITTINGS TRADING LLC https://www.google.com/maps?q=24.9638349,55.1358376&z=17&hl=en 13-Aug-26 14:00:00 - 18:00:00 Check and rectify the phone issues. AMC - Antonio Active
Rahul Saji Tabarak Investment Capital LTD DIFC, Burj Daman, Office 208 12-Aug-26 08:00:00 - 18:00:00 Check and rectify the system issues for the user. Check the server and network related issues. AMC - Antonio Active
Rahul Saji Expeed Office 118, Al Hilal Bank Building Al Nahda Road, Al Qusais, Dubai 12-Aug-26 14:00:00 - 18:00:00 Check and rectify the system issues. Phone: +971 42523503 AMC - Antonio Active
Rahul Saji Wellbeing Bureau Abu Dhabi 11-Aug-26 11:00:00 - 12:00:00 Email Migration for 2Email Account - Tender Creation- Calender Migration (Migration will be done mannual and there are some chances to loss some calender during migration from Cpanel to M365 Office)- Work will be done Weekdays 9-6 Office hour On Call BCQ/2026/003806 Antonio Active
Rajakumar Selvaraj, Rajveer Raiya Drees & Sommer Dubai Design District Building 02, Office No. 114 Dubai UAE 25-Aug-26 09:00:00 - 14:00:00 PROFESSIONAL SERVICE Scope of Work: - - Rack dressing and cable management. - Router installation in the rack. - Router port configuration. - Network configuration as per the existing router. - Router testing and handover. - Switch installation in the rack. - Switch VLAN configuration. - Switch port configuration and VLAN mapping. - Switch testing and handover. Carole Kane: +971 52 6784502 Project BCQ/2026/003858 Antonio Active
Rajveer Raiya IMBA Building Materials Trading LLC https://share.google/0x67waxq4s9ftHQqS 09-Sep-26 21:00:00 - 18:00:00 AMC IT Audit. mai@imbauae.com +971 56 540 4500 Ras Al Khaimah, United Arab Emirates | P.O. Box 834 AMC No Material - Antonio Active
Rajveer Raiya DEEP SEA PIPES AND FITTINGS TRADING LLC https://www.google.com/maps?q=24.9638349,55.1358376&z=17&hl=en 08-Sep-26 09:00:00 - 12:00:00 Check and rectify the CCTV connectivity issues. AMC No Material - Antonio Active
Rajveer Raiya PANIREX FZE https://share.google/f51aLX3myWT3F5ZdW 08-Sep-26 14:00:00 - 18:00:00 Collect the SSD from the office. SSD replacement and system setup. On Call To be collected from office BCQ/2026/004645 Antonio Active
Rajveer Raiya RAD STAR TRADING https://maps.app.goo.gl/7PAVv3ojjLV7Njvt9?g_st=ic 07-Sep-26 09:00:00 - 11:00:00 Acronis Endpoint Security Installation location :SINGLE BUSINESS TOWER -OFFICE NO -2404 Contact :0554119776 Name: MS. Furzuna Project No Material LCQ/2026/00AS602 Antonio Active
Rajveer Raiya Mesco Marine Services Y02, Street No. 37 - Industrial Area 13- Sharjah 07-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance. AMC No Material - Antonio Active
Rajveer Raiya Gourmet Foods FZC (Martin Hulle FZC) https://share.google/WbyXNihhK1fL241mv 05-Sep-26 09:00:00 - 18:00:00 Preventive Maintenance. RAM upgrade for the user. AMC To be collected from office - Antonio Active
Rajveer Raiya MAHARAJA BHOG RESTAURANT LLC https://share.google/jSrxNzKnXXxb0rtWT 04-Sep-26 09:00:00 - 10:00:00 Check and rectify the CCTV issues. https://share.google/jSrxNzKnXXxb0rtWT Mr. Yuvraj : 0562674355 On Call No Material LCQ/2026/001246 Antonio Active
Rajveer Raiya AL MANARAH INSURANCE SERVICES CO. LLC Dubai 04-Sep-26 12:00:00 - 13:00:00 FIREWALL INSTALLATION AND MIGRATION WITH ALL THE REQUIRED MATERIAL INCLUDING FORTICONVERTER Contact details: "Maroun G. Challita" <mgchallita@almanarahinsurance.ae> M +971 58 581 6441 Project To be collected from office BCQ/2026/003062 Antonio Active
Rajveer Raiya RAMSHA HOME - F.Z.C https://maps.app.goo.gl/fEBEe7pDV2Kud44G8 03-Sep-26 09:00:00 - 18:00:00 - 3CX App configuration for the users. - SIM calling issues. Customer Contact: Mr. Asif Hasan Mohammad Mobile: +971 56 758 7350 Location: Oasis Tower 2, Sharjah Project No Material LCQ/2026/001212 Antonio Active
Rajveer Raiya RAMSHA HOME - F.Z.C https://maps.app.goo.gl/fEBEe7pDV2Kud44G8 02-Sep-26 09:00:00 - 14:00:00 - 3CX App configuration for the users. - SIM calling issues. Customer Contact: Mr. Asif Hasan Mohammad Mobile: +971 56 758 7350 Location: Oasis Tower 2, Sharjah On Call No Material - Antonio Active
Rajveer Raiya Kakaw Manufacturing CO. LLC https://maps.app.goo.gl/PtDbeM7GuswigfUTA 01-Sep-26 09:00:00 - 14:00:00 Reconfiguration of 4 Phones, Reseting of credentials for AVAYA PABX Reconfiguration. Kakaw Manufacturing CO. LLC +971 55 363 6548 Project No Material LCQ/2026/001131 Antonio Active
Rajveer Raiya RAMSHA HOME - F.Z.C https://maps.app.goo.gl/fEBEe7pDV2Kud44G8 29-Aug-26 09:00:00 - 12:00:00 - 3CX App configuration for the users. - SIM calling issues. Customer Contact: Mr. Asif Hasan Mohammad Mobile: +971 56 758 7350 Location: Oasis Tower 2, Sharjah On Call No Material - Antonio Active
Rajveer Raiya Kinoya The Onyx Tower 2 - Floor P2 Dubai, United Arab Emirates 27-Aug-26 14:00:00 - 18:00:00 Check and rectify the phone issues. AMC - Antonio Active
Rajveer Raiya SUNSHINE LAND PEDIATRIC DENTISTRY CLINIC https://maps.app.goo.gl/L5FTdKP9syscZjET6 26-Aug-26 09:00:00 - 12:00:00 Collect the materials from the office. PABX and Phone Installation and configuration. Company: SUNSHINE LAND PEDIATRIC DENTISTRY CLINIC Location: https://maps.app.goo.gl/L5FTdKP9syscZjET6 Contact Person: AILENE - +971 55 962 5595 Project BCQ/2026/004927 Antonio Active
Rajveer Raiya Engineering Techniques Services https://share.google/f7TAkiG089htUGlOZ 24-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. Address: Building 25 Street #29 - Industrial Area 11 - Industrial Area - Sharjah AMC - Antonio Active
Rajveer Raiya Megan International DMCC https://maps.app.goo.gl/1QxzQkuqs9Nti2dB6 21-Aug-26 09:00:00 - 12:00:00 Check and rectify the Call issues. nit No 2308 Cluster X - Building X2, JLT Dubai UAE https://www.google.com/maps/place/25%C2%B004'49.2%22N+55%C2%B009'11.1%22E/@25.0803375,55.1505013,69… (3502, X3 tower, X cluster, JLT) On Call BCQ/2026/005021 Antonio Active
Rajveer Raiya Mesco Marine Services: Shipchandler https://maps.app.goo.gl/PDHjXeLiporw3mp7A?g_st=iw 20-Aug-26 14:00:00 - 18:00:00 Please confirm the location with the client. Check and rectify the printer issues. AMC - Antonio Active
Rajveer Raiya Stellar USP Office 2602, Aspect Tower, Bay Avenue - Business Bay - Dubai 19-Aug-26 09:00:00 - 12:00:00 Collect the materials from the office. Collect the Power supply from the office. Replace the system power supply. AMC - Antonio Active
Rajveer Raiya TerraPay Middle East Dubai Internet City, Innovation HUB Building 2, 1st Floor, Wing A-102, 103 Dubai, United Arab Emirates 19-Aug-26 14:00:00 - 18:00:00 HID controller password reset. AMC - Antonio Active
Rajveer Raiya Bin Ham North Ocean Elevator LLC Etihad Building - 35 8th St - Port Saeed - Floor- 08 - Dubai 18-Aug-26 08:30:00 - 12:00:00 Sharp 8:30 at client office. - HDD replacement of the Server. - RAID controller replacement. AMC - Antonio Active
Rajveer Raiya TARTAN GLOBAL General Trading L.L.C. 3306, Concord Tower Media City Dubai 416130 United Arab Emirates 18-Aug-26 14:00:00 - 18:00:00 - Preventive Maintenance. - Antivirus Installation. AMC - Antonio Active
Rajveer Raiya Mesco Marine Services: Ship Chandler Al Khalidiya District - Al Mamzar - Sharjah 17-Aug-26 09:00:00 - 18:00:00 Preventive Maintenance. AMC - Antonio Active
Rajveer Raiya LIBERTY ROYAL TIRES AND AUTO SERVICES L.L.C https://maps.app.goo.gl/kzztoWVUYH13GtWXA 15-Aug-26 09:00:00 - 12:00:00 *AFTER CONFIRMATION* Check and rectify the WiFi issues. On Call LCSQ/2026/000967 Antonio Active
Rajveer Raiya Delta Center https://maps.app.goo.gl/8HphSfvpWDPDLR9b7?g_st=ic 14-Aug-26 09:00:00 - 12:00:00 Check and rectify the CCTV issues. (please coordinate with Moiz and ELV team). Yousef: +971 52 362 6973 Project BCQ/2026/004647 Antonio Active
Rajveer Raiya, Shoaib Qureshi Maples Fund Services (Middle East) Limited Level 14 Burj Daman, Dubai International Financial Centre, PO Box 506734 Dubai, United Arab Emirates 14-Aug-26 14:00:00 - 18:00:00 Trace and Label the necessary cables in the rack, Mark Anthony Bagunu: +971 56 413 1551 Project BCQ/2026/000811 Antonio Active
Rajveer Raiya Mesco Marine Services Y02, Street No. 37 - Industrial Area 13- Sharjah 13-Aug-26 09:00:00 - 18:00:00 9:00 AM at Liberty office. (Zahid will drop) Preventive Maintenance. AMC - Antonio Active
Rajveer Raiya Humai FZCO https://maps.app.goo.gl/nyiLNEdJPdrRtChbA 12-Aug-26 09:00:00 - 12:00:00 Collect the materials from the office. Reconfiguration of 3CX IP PBX system on the new office firewall Configuration of Dinstar Gateway with 3CX IP PBX system, including setup, testing, and commissioning Exclusions: Cabling works Civil works Firewall hardware supply or replacement Any additional hardware or accessories not mentioned in the above scope. • Client Name: Muhammed Najeeb • Email: mnajeeb@humai.ae • Contact: +971 55 999 4135 • Location: Silver Tower, JLT, 30th Floor, Unit 30E Google Maps: https://maps.app.goo.gl/nyiLNEdJPdrRtChbA Project BCQ/2026/003802 Antonio Active
Rajveer Raiya Golden Falcon General Trading LLC Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE 12-Aug-26 14:00:00 - 18:00:00 Check and rectify the system issues. AMC - Antonio Active
Rajveer Raiya Asma Hotel Al Barsha https://maps.app.goo.gl/8wggQs1qjJg32CHL8 11-Aug-26 09:00:00 - 12:00:00 SOW: Server Amber light and Smart Storage Battery Fail warning. Rijas: +971 52 693 0899 AMC - Antonio Active
Rajveer Raiya PERIPHERALS AND PARTS TRADING LLC Khalid Bin Waleed Road Al Zarooni Building Office # 103, Opposite Panorama Grand Hotel Bur Dubai Dubai 11-Aug-26 14:00:00 - 18:00:00 PROFESSIONAL SERVICE IP PABX installation 3CX with Gateway • Basic installation and IP Configuration • User Creation • SIP trunk configuration between gateway and 3CX • Inbound and Outbound configuration • DID and DOD configuration • Configure the inbound and outbound • Extension and number mapping • URL Creation for external access (If required) * • Inbound and outbound testing • User Training to Admin • Handover Note : Port forwarding needs to be done from the client firewall for the external access VPN connectivity should be there between the branches. Name - Mr. Sourav Mahajan Mobile - 971 50 870 4887 Email - service@pnpdxb.com Project BCQ/2026/002930 Antonio Active
Rajveer Raiya FUELING MARITIME MIDDLE EAST FZCO Unit No: 2908 LIWA HEIGHTS 1 Plot No: JLT-PH2-W3A Jumeirah Lakes Towers Dubai 10-Aug-26 09:00:00 - 14:00:00 Biometric Configuration. Location1: Fueling Middle east Location2: Glander Bunkering Please discuss with Hussain Admin. Darwin Glander Bunkering: +971 56 402 3873 Project BCQ/2026/003903 Antonio Active
Rajveer Raiya PERIPHERALS AND PARTS TRADING LLC Khalid Bin Waleed Road Al Zarooni Building Office # 103, Opposite Panorama Grand Hotel Bur Dubai Dubai 10-Aug-26 09:00:00 - 18:00:00 PROFESSIONAL SERVICE IP PABX installation 3CX with Gateway • Basic installation and IP Configuration • User Creation • SIP trunk configuration between gateway and 3CX • Inbound and Outbound configuration • DID and DOD configuration • Configure the inbound and outbound • Extension and number mapping • URL Creation for external access (If required) * • Inbound and outbound testing • User Training to Admin • Handover Note : Port forwarding needs to be done from the client firewall for the external access VPN connectivity should be there between the branches. Name - Mr. Sourav Mahajan Mobile - 971 50 870 4887 Email - service@pnpdxb.com Project BCQ/2026/002930 Antonio Active
Sachin Mohandas Al Massa Architectural General Contracting L.L.C https://www.google.com/maps?q=24.221372604370117,55.763607025146484&z=17&hl=en 09-Sep-26 09:00:00 - 12:00:00 Meeting for Project implementation. Site Visit No Material - Antonio Active
Sachin Mohandas AL MANARAH INSURANCE SERVICES CO. LLC https://share.google/Dx3n0tUMm9IeBl5q3 08-Sep-26 12:00:00 - 13:00:00 FIREWALL INSTALLATION AND MIGRATION WITH ALL THE REQUIRED MATERIAL INCLUDING FORTICONVERTER Address: NBK Tower - 13th floor, Office 1306 - Airport Rd - Al Manhal - W15 02 - Abu Dhabi Project To be collected from office BCQ/2026/002922 Antonio Active
Sachin Mohandas Crystal Offshore Middle East Al Momourah Khalifa Port Plot P2A - Sector Khai 2 - Abu Dhabi 07-Sep-26 08:00:00 - 12:00:00 Check and rectify the system issues. AMC No Material - Antonio Active
Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 07-Sep-26 15:00:00 - 00:00:00 Network Migration. Project No Material BCQ/2026/002063 Antonio Active
Sachin Mohandas Little Founders Nursery https://maps.app.goo.gl/xWuG7FvbeJaMRM3k6?g_st=iw 03-Sep-26 09:00:00 - 11:00:00 MCC CCTV System PM AMC, PM - Antonio Cancelled
Sachin Mohandas Ocean View Hotel LLC: Grand Hyatt West Corniche, Abu Dhabi, UAE Abu Dhabi UAE 03-Sep-26 09:00:00 - 18:00:00 1. Master Image Creation Install Windows 11 (or approved OS) Install required applications: Microsoft Office Antivirus Line-of-business applications PDF reader Browser configurations Apply updates and patches Configure baseline settings Sysprep and capture master image 2. Image Deployment Deploy image to 135 systems via: o Network deployment (WDS/MDT) or o USB-based imaging (if required) System naming convention Join systems to domain Installation of required software and printer Assign to correct OU Apply GPO policies 3. Post-Deployment Configuration Verify domain authentication Printer mapping Shared drive access Email configuration (if applicable) User login validation Project No Material BCQ/2026/002063 Antonio Active
Sachin Mohandas Gulf Extrusions LLC - Abu Dhabi Abu Dhabi 02-Sep-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project No Material BCQ/2025/009609 Antonio Active
Sachin Mohandas Gulf Extrusions LLC - Abu Dhabi West Wing, Al Jazira Sports Club - Muroor Rd - Al Nahyan - Zone 1 - Abu Dhabi 01-Sep-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project No Material BCQ/2025/009609 Antonio Active
Sachin Mohandas R A A L C GOVERNMENT TRANSACTIONS SERVICES L.L.C EXM-01A Bin Sougat Centre, Airport Rd Al Rashidiya, Dubai Dubai UAE 19-Aug-26 09:00:00 - 18:00:00 • SharePoint Storage: Review the current SharePoint utilization, which is at approximately 80% capacity, and recommend suitable options to optimize storage, archive data, migrate content, or increase storage capacity. • CCTV Storage Extension: Assess the current CCTV setup with 100-day retention and evaluate the feasibility of extending the storage retention period to 180 days (6 months), including the required hardware, storage expansion, or cloud-based alternatives. • Guest Portal Review: Review the existing guest/captive portal configuration and provide recommendations for performance optimization, user experience improvements, and security enhancements. AMC - Antonio Active
Sachin Mohandas Gulf Extrusions LLC - Abu Dhabi Abu Dhabi 18-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Sachin Mohandas Crystal Offshore Middle East Al Momourah Khalifa Port Plot P2A - Sector Khai 2 - Abu Dhabi 18-Aug-26 09:00:00 - 12:00:00 System Setup for the user. AMC - Antonio Active
Sachin Mohandas Gulf Extrusions LLC - Abu Dhabi Abu Dhabi 17-Aug-26 09:00:00 - 18:00:00 Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai Project BCQ/2025/009609 Antonio Active
Sachin Mohandas Golden Falcon General Trading LLC Dubai Investment Park 2 | P.O. Box 51931 Dubai | UAE 15-Aug-26 09:00:00 - 18:00:00 Firewall Installation & configuration AMC - Antonio Active
Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 13-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 12-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Sachin Mohandas Gulf Extrusions LLC Jebel Ali Industrial Area l, Near dubai aluminum – Dubai Dubai 11-Aug-26 09:00:00 - 18:00:00 Professional Services 1)Active Directory Deployment (Design, Build & Integration) 2)User Profile & Workstation Migration (350 Users) Project BCQ/2025/009609 Antonio Active
Sachin Mohandas McCone Properties Onyx Tower 2 - Office P305 - 308 Al Thanyah Third - The Greens Dubai UAE 10-Aug-26 14:00:00 - 18:00:00 SCOPE OF WORK 1>Configuration of VEWS5203-200 2> Customization of Login Pages 3> Configuration of Service Zones, User Authentication, Authorization & Accounting Policies & Network Policies 4> Configuration of Guest WiFi Authentication such as Paid WiFi service with OnDemand Authentication with WiFi Token & different Billing Plans | SMS Authentication with Guest Data Collection Like Name, Email, Mobile Number etc. | Social Media Login with Guest Data Collection Provided by Social Media Platform | Email Verification with Guest Data Collection Like Name, Email, Mobile Number etc. | Free WiFi & Collect Guest Data Like Name, Email, Mobile Number etc. 5> Briefing to IT Manager on configuration & settings 6> PoE+ Switches, Cabling & Civil works not considered 7>Configuration on existing 3rd Party Firewall/Switches/AP’s to be done by Customer Vendor Contact Details: Name: Mohammed Haseeb Ur Rahman Company: APPLICOM FZ-LLC Mobile: +971 56 534 8833 Email: haseeb@applicom.net End Customer Details: Contact Person: Mr. Siros Raju Email: siros.r@mcconeproperties.com Mobile: +971 52 413 4466 Project BCQ/2026/003757 Antonio Active